Final | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton No card posted. Final ok
|
Final | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Please call 30 minutes prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton 601 ok, 602 ok, 603 ok seal around patio receptacle. 604 210.52- Receptacle outlet shall be located with in 6' of bed closet door. Switch cover off for patch. 605 210.52- Receptacle outlet shall be located with in 6' of master bed door. 406.12- 2 patio outdoor receptacles shall be tamper resistant. 300.15- Switch covers off for patch. Parking ramp door start stop station conduit subject to weather shall have raintight fittings. Notes: All Floor heat circuits for future floor heat permit will be required. All other areas checked out ok in all floors.
|
Electrical Rough-In | 10/30/2016 | 10/31/2016 | 10/31/2016 | A | PART |
James Ady
|
|
|
Partial Final - please call Ryan 30 minutes prior. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Temp final ok on 4th and 5th floor. Roof top final ok
|
Electrical Rough-In | 10/27/2016 | 10/28/2016 | 10/28/2016 | A | CANC |
James Ady
|
|
|
Partial Final. 4th and 5th floor final. Phone #: ###-#### Inspection requested via web by Kerri Hamilton needed final
|
Final | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | FAIL |
James Ady
|
|
|
Partial Final. 4th and 5th floor final. Phone #: ###-#### Inspection requested via web by Kerri Hamilton List of corrections for 4th and 5th floor left with Ryan. Check Flex straps on all Water heaters and Furnaces and Counter recep layout in kitchen
|
Electrical Rough-In | 10/26/2016 | 10/27/2016 | 10/27/2016 | P | CANC |
James Ady
|
|
|
Please call 20 minutes prior so Ryan can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton Needed partial final
|
Final | 10/27/2016 | 10/27/2016 | 10/27/2016 | P | PART |
James Ady
|
|
|
Please call 20 minutes prior so Ryan can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton unit 302 Bad AFCI, 305 Bad Bath GFCI recep, Unit identification needs installed on 3rd floor. Lobby and 2nd floor parking garage Final ok
|
Electrical Rough-In | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Eric Story
|
|
|
Late AM Please! Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground on west of building for street lights
|
Electrical Rough-In | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 6th floor corridor grid rough in ok cover
|
Electrical Rough-In | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | FAIL |
Rock A. Hudson
|
|
|
6th Floor Corridor Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton 300.21- All electrical penetrations shall be sealed. 4 locations low volt wiring penetrations in ceiling and walls. 1 ENT, 2 4" square holes, EMT at back stair entrance
|
Electrical Rough-In | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
James Ady
|
|
|
5th floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton 5th floor corridor Ceiling only ok to cover
|
Electrical Rough-In | 9/19/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Eric Story
|
|
|
4th floor corridor Phone #: ###-#### Inspection requested via web by Kerri Hamilt Level 4 corridor ceilngs only ok cover, as noted on print rooms 301,307,306 are already inspected and are fine.
|
Electrical Rough-In | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
James Ady
|
|
|
3rd Floor Corrider Phone #: ###-#### Inspection requested via web by Kerri Hamilton 3rd floor corridor ceiling only
|
Electrical Rough-In | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton lobby walls and hard lids only ok cover
|
Electrical Rough-In | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Eric Story
|
|
|
6th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton 6th floor hard lids above all units and 1 little hall drop only ok cover
|
Electrical Rough-In | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Rock A. Hudson
|
|
|
3rd ; 4th Floor Corridor drops Phone #: ###-#### Inspection requested via web by Kerri Hamilton Floor 3, 4, 5, corridor drop hardlids rough in ok cover
|
Electrical Rough-In | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Rock A. Hudson
|
|
|
RM 604 ; 605 Phone #: ###-#### Inspection requested via web by Kerri Hamilton 604, 605 drop lids rough in ok cover
|
Electrical Rough-In | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PASS |
Rock A. Hudson
|
|
|
Rooms 602 ; 604 Phone #: ###-#### Inspection requested via web by Kerri Hamilton 602 complete 604 entrance not ready rest of drop lids rough in ok cover
|
Electrical Rough-In | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Eric Story
|
|
|
30 Minute call ahead for access please Ryan ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton room 603 dropped hard lids ok cover
|
Electrical Rough-In | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 601 only drop lids rough in ok cover
|
Electrical Rough-In | 6/27/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton 505, 506, 507 Drop lid rough in ok cover
|
Electrical Rough-In | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Rock A. Hudson
|
|
|
5th Floor Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rooms 501, 502, 503, 504 drop lids rough in ok cover
|
Final | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | CANC |
Rock A. Hudson
|
|
|
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton Needed rough in inspection
|
Electrical Rough-In | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton rooms 401, 402, 403, 404, 405 drop ceilings rough in ok cover
|
Electrical Rough-In | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 6th floor rough in ok to cover
|
Electrical Rough-In | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Eric Story
|
|
|
Ryan Barnes Room 306 Phone #: ###-#### Inspection requested via web by Kerri Hamilton Room 306 dropped hard lid cieling only ok cover
|
Electrical Rough-In | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Rock A. Hudson
|
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton Drop hardlid in units 301 thru 305, 307,skip 306, and checked 503 rough in ok cover
|
Electrical Rough-In | 5/11/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Rex Boyles
|
|
|
Ryan Barnes Rooms 503 ; 506 Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok room 506 ceilings, north and south stairwells from 3rd floor to 7th floor also ok
|
Electrical Rough-In | 5/10/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Rex Boyles
|
|
|
RYAN WALL ; CEILING Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok 504 thru 507 except drop ceilings
|
Electrical Rough-In | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | PASS |
Rock A. Hudson
|
|
|
Ryan Phone #: ###-#### Inspection requested via web by Kerri Hamilton 501,502 All , 503 Walls only, 4th and 5th floor corridor wall Rough in ok to cover
|
Electrical Rough-In | 4/30/2016 | 5/2/2016 | 5/2/2016 | A | PASS |
Rex Boyles
|
|
|
Ryan 7th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok mechancical penthouse/ elevator room walls and ceiling
|
Electrical Rough-In | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rms. 404,405,406 and 407
|
Electrical Rough-In | 4/16/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Rex Boyles
|
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rooms 401, 402 and 403
|
Electrical Rough-In | 4/8/2016 | 4/11/2016 | 4/11/2016 | P | PASS |
Rex Boyles
|
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rms. 304,305,306 and 307. 3rd floor corridor walls also ok. NOTE: Ryan will ask for another inspection for changes in rm.301 when ready
|
Electrical Rough-In | 3/31/2016 | 4/4/2016 | 4/4/2016 | P | PASS |
Rex Boyles
|
|
|
Please call 30 min prior to inspection for access Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rooms 301, 302 and 303
|
Electrical Rough-In | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ramp ceiling ok
|
Electrical Rough-In | 2/10/2016 | 2/11/2016 | 2/11/2016 | P | PASS |
Rex Boyles
|
|
|
Please call Ryan Barnes 30 min prior for coordination Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i level 2 parking garage ceiling ok (ramp area not ready)
|
Conference | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | DONE |
Rex Boyles
|
|
|
Requesting conference with Darrel prior to rough in inspection. Please call Ryan at ###-#### 30 min in advance as GC would like to be included in meeting. Thank you Phone #: ###-#### Inspection requested via web by Kerri Hamilton look at tyvek on 4th and 5th floors installed on floors by GC to keep 3rd floor dry so NM cable can be started. Informed GC and EEG to monitor weather and incoming water during installation. GC said they will keep crew on hand to keep dry. GC says roof should be completed first week of March. GC says they will cover cost to remove and replace nm cable if wet.
|
Electrical Rough-In | 2/8/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i walls and hard lids on 1st and 2nd floors see e sheets in GC's office
|
Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 | P | CANC |
Rex Boyles
|
|
|
Need meeting with Darrel prior to Rough-In inspection Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Conference | 12/15/2015 | 12/16/2015 | 12/16/2015 | P | DONE |
Daryl DeGrange
|
|
|
Brad Hoots. Please call an hour in advance. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed requirements for receptacle layout in Condo living areas, wiring methods, best practice options for drying-in working areas for trade workers
|
Conference | 12/15/2015 | 12/16/2015 | 12/15/2015 | P | CANC |
Rex Boyles
|
|
|
Brad Hoots Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Electrical Rough-In | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | CANC |
Rex Boyles
|
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton needed conf
|
Conference | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | DONE |
Rex Boyles
|
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton pre construction walk thru on problem areas with glass walls to meet spacing as per NEC. Floor boxes will need to be installed to meet 210.52 (A)(1) and (3). Go over all other residential requirements. Also discussed appliance cord installation (by electricians)
|
Permanent Service | 11/11/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Rex Boyles
|
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok
|