Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE15-02641
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 119 S 10TH ST
Project Name 
Customer Number590
ePlanReviewNo
Description
New: Electrical for construction of 4 story condos
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/10/201611/14/201611/14/2016APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
No card posted.
Final ok
Final11/9/201611/9/201611/9/2016PFAIL
DetailsRock A. Hudson
Please call 30 minutes prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton
601 ok, 602 ok, 603 ok seal around patio receptacle. 604 210.52- Receptacle outlet shall be located with in 6' of bed closet door. Switch cover off for patch.
605 210.52- Receptacle outlet shall be located with in 6' of master bed door.
406.12- 2 patio outdoor receptacles shall be tamper resistant. 300.15- Switch covers off for patch.
Parking ramp door start stop station conduit subject to weather shall have raintight fittings.
Notes: All Floor heat circuits for future floor heat permit will be required. All other areas checked out ok in all floors.
Electrical Rough-In10/30/201610/31/201610/31/2016APART
DetailsJames Ady
Partial Final - please call Ryan 30 minutes prior. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Temp final ok on 4th and 5th floor. Roof top final ok
Electrical Rough-In10/27/201610/28/201610/28/2016ACANC
DetailsJames Ady
Partial Final. 4th and 5th floor final. Phone #: ###-#### Inspection requested via web by Kerri Hamilton needed final
Final10/28/201610/28/201610/28/2016PFAIL
DetailsJames Ady
Partial Final. 4th and 5th floor final. Phone #: ###-#### Inspection requested via web by Kerri Hamilton List of corrections for 4th and 5th floor left with Ryan. Check Flex straps on all Water heaters and Furnaces and Counter recep layout in kitchen
Electrical Rough-In10/26/201610/27/201610/27/2016PCANC
DetailsJames Ady
Please call 20 minutes prior so Ryan can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton Needed partial final
Final10/27/201610/27/201610/27/2016PPART
DetailsJames Ady
Please call 20 minutes prior so Ryan can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton unit 302 Bad AFCI, 305 Bad Bath GFCI recep, Unit identification needs installed on 3rd floor. Lobby and 2nd floor parking garage Final ok
Electrical Rough-In10/6/201610/7/201610/7/2016APASS
DetailsEric Story
Late AM Please! Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Underground on west of building for street lights
Electrical Rough-In10/4/201610/4/201610/4/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
6th floor corridor grid rough in ok cover
Electrical Rough-In10/3/201610/4/201610/4/2016AFAIL
DetailsRock A. Hudson
6th Floor Corridor Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton
300.21- All electrical penetrations shall be sealed. 4 locations low volt wiring penetrations in ceiling and walls. 1 ENT, 2 4" square holes, EMT at back stair entrance
Electrical Rough-In9/26/20169/26/20169/26/2016PPASS
DetailsJames Ady
5th floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton 5th floor corridor Ceiling only ok to cover
Electrical Rough-In9/19/20169/20/20169/20/2016PPASS
DetailsEric Story
4th floor corridor Phone #: ###-#### Inspection requested via web by Kerri Hamilt
Level 4 corridor ceilngs only ok cover, as noted on print rooms 301,307,306 are already inspected and are fine.
Electrical Rough-In8/31/20169/1/20169/1/2016PPASS
DetailsJames Ady
3rd Floor Corrider Phone #: ###-#### Inspection requested via web by Kerri Hamilton 3rd floor corridor ceiling only
Electrical Rough-In8/15/20168/16/20168/16/2016APASS
DetailsEric Story
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
lobby walls and hard lids only ok cover
Electrical Rough-In8/4/20168/5/20168/5/2016APASS
DetailsEric Story
6th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton
6th floor hard lids above all units and 1 little hall drop only ok cover
Electrical Rough-In8/1/20168/2/20168/2/2016APASS
DetailsRock A. Hudson
3rd ; 4th Floor Corridor drops Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Floor 3, 4, 5, corridor drop hardlids rough in ok cover
Electrical Rough-In7/21/20167/22/20167/22/2016APASS
DetailsRock A. Hudson
RM 604 ; 605 Phone #: ###-#### Inspection requested via web by Kerri Hamilton 604, 605 drop lids rough in ok cover
Electrical Rough-In7/20/20167/20/20167/20/2016PPASS
DetailsRock A. Hudson
Rooms 602 ; 604 Phone #: ###-#### Inspection requested via web by Kerri Hamilton
602 complete 604 entrance not ready rest of drop lids rough in ok cover
Electrical Rough-In7/14/20167/15/20167/15/2016APASS
DetailsEric Story
30 Minute call ahead for access please Ryan ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton
room 603 dropped hard lids ok cover
Electrical Rough-In7/11/20167/12/20167/12/2016APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
601 only drop lids rough in ok cover
Electrical Rough-In6/27/20166/28/20166/28/2016PPASS
DetailsRock A. Hudson
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton
505, 506, 507 Drop lid rough in ok cover
Electrical Rough-In6/21/20166/22/20166/22/2016APASS
DetailsRock A. Hudson
5th Floor Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Rooms 501, 502, 503, 504 drop lids rough in ok cover
Final6/6/20166/7/20166/7/2016ACANC
DetailsRock A. Hudson
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Needed rough in inspection
Electrical Rough-In6/7/20166/7/20166/7/2016PPASS
DetailsRock A. Hudson
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton
rooms 401, 402, 403, 404, 405 drop ceilings rough in ok cover
Electrical Rough-In5/25/20165/26/20165/26/2016PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 6th floor rough in ok to cover
Electrical Rough-In5/23/20165/24/20165/24/2016APASS
DetailsEric Story
Ryan Barnes
Room 306 Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Room 306 dropped hard lid cieling only ok cover
Electrical Rough-In5/20/20165/23/20165/23/2016APASS
DetailsRock A. Hudson
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Drop hardlid in units 301 thru 305, 307,skip 306, and checked 503 rough in ok cover
Electrical Rough-In5/11/20165/12/20165/12/2016PPASS
DetailsRex Boyles
Ryan Barnes
Rooms 503 ; 506 Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok room 506 ceilings, north and south stairwells from 3rd floor to 7th floor also ok
Electrical Rough-In5/10/20165/11/20165/11/2016PPASS
DetailsRex Boyles
RYAN
WALL ; CEILING Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok 504 thru 507 except drop ceilings
Electrical Rough-In5/2/20165/2/20165/2/2016PPASS
DetailsRock A. Hudson
Ryan Phone #: ###-#### Inspection requested via web by Kerri Hamilton
501,502 All , 503 Walls only, 4th and 5th floor corridor wall Rough in ok to cover
Electrical Rough-In4/30/20165/2/20165/2/2016APASS
DetailsRex Boyles
Ryan
7th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok mechancical penthouse/ elevator room walls and ceiling
Electrical Rough-In4/26/20164/26/20164/26/2016PPASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rms. 404,405,406 and 407
Electrical Rough-In4/16/20164/18/20164/18/2016PPASS
DetailsRex Boyles
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rooms 401, 402 and 403
Electrical Rough-In4/8/20164/11/20164/11/2016PPASS
DetailsRex Boyles
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rms. 304,305,306 and 307. 3rd floor corridor walls also ok. NOTE: Ryan will ask for another inspection for changes in rm.301 when ready
Electrical Rough-In3/31/20164/4/20164/4/2016PPASS
DetailsRex Boyles
Please call 30 min prior to inspection for access Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rooms 301, 302 and 303
Electrical Rough-In3/24/20163/25/20163/25/2016APASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ramp ceiling ok
Electrical Rough-In2/10/20162/11/20162/11/2016PPASS
DetailsRex Boyles
Please call Ryan Barnes 30 min prior for coordination Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i level 2 parking garage ceiling ok (ramp area not ready)
Conference2/9/20162/9/20162/9/2016PDONE
DetailsRex Boyles
Requesting conference with Darrel prior to rough in inspection. Please call Ryan at ###-#### 30 min in advance as GC would like to be included in meeting. Thank you Phone #: ###-#### Inspection requested via web by Kerri Hamilton look at tyvek on 4th and 5th floors installed on floors by GC to keep 3rd floor dry so NM cable can be started. Informed GC and EEG to monitor weather and incoming water during installation. GC said they will keep crew on hand to keep dry. GC says roof should be completed first week of March. GC says they will cover cost to remove and replace nm cable if wet.
Electrical Rough-In2/8/20162/9/20162/9/2016PPASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i walls and hard lids on 1st and 2nd floors see e sheets in GC's office
Conference2/8/20162/9/20162/9/2016PCANC
DetailsRex Boyles
Need meeting with Darrel prior to Rough-In inspection Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
Conference12/15/201512/16/201512/16/2015PDONE
DetailsDaryl DeGrange
Brad Hoots. Please call an hour in advance. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed requirements for receptacle layout in Condo living areas, wiring methods, best practice options for drying-in working areas for trade workers
Conference12/15/201512/16/201512/15/2015PCANC
DetailsRex Boyles
Brad Hoots Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
Electrical Rough-In12/3/201512/4/201512/4/2015ACANC
DetailsRex Boyles
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton needed conf
Conference12/4/201512/4/201512/4/2015PDONE
DetailsRex Boyles
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton pre construction walk thru on problem areas with glass walls to meet spacing as per NEC. Floor boxes will need to be installed to meet 210.52 (A)(1) and (3). Go over all other residential requirements. Also discussed appliance cord installation (by electricians)
Permanent Service11/11/201511/12/201511/12/2015APASS
DetailsRex Boyles
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok