Final | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | PASS |
Eric Story
|
|
|
Please come late morning if possible thanks so much for working with us Phone #: ###-#### Inspection requested via web by Don Lustig final ok
|
Final | 11/17/2015 | 11/18/2015 | 11/18/2015 | A | NR |
Eric Story
|
|
|
Late morning if possible call Corey with questions Phone #: ###-#### Inspection requested via web by Don Lustig to many loose ends
|
Electrical Rough-In | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Eric Story
|
|
|
rough in the floor boxes in the exercise room Phone #: ###-#### Inspection requested via web by Don Lustig floor boxes in excersize room and underground ok cover
|
Electrical Rough-In | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Eric Story
|
|
|
final ceiling rough cover inspection Phone #: ###-#### Inspection requested via web by Don Lustig cielings as per contractors print ok cover
|
Electrical Rough-In | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Eric Story
|
|
|
need a cover inspection on the rest of the building call dave on site to walk thru. thanks Phone #: ###-#### Inspection requested via web by Don Lustig rough-in as per contractors print ok cover
|
Electrical Rough-In | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Eric Story
|
|
|
rough in walls excercise rooms up and down call dave for walk thru on site. Phone #: ###-#### Inspection requested via web by Don Lustig 1st and 2nd floor exercize rooms and 1st floor kitchen as per contractors prints ok cover
|
Electrical Rough-In | 9/8/2015 | 9/9/2015 | 9/9/2015 | A | PASS |
Eric Story
|
|
|
this is for partial cover in the hot tub area and kitchen wall call dave with questions Phone #: ###-#### Inspection requested via web by Don Lustig hot tub and mens and womens bath
|