Final | 9/8/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Paula Gietzen ok final
|
Final | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Solar panel installation ready for final inspection. Contact is Logan Gietzen ###-#### Phone #: ###-#### Inspection requested via web by Paula Gietzen NEC 110.3(B) LIsted and labeling of a certified third party testing laboratory , NEC 690.43 Called no answer
|