Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberELE15-02740
StatusFinaled
Name RELIANCE ELECTRIC
Site Address 3050 S SHOSHONE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New: All phases of electrical for new building. 8/23/16-adding wiring for office furniture to the guest rooms
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/1/20169/2/20169/2/2016APASS
DetailsDaryl DeGrange
Seth Phone #: ###-#### Guess room furniture light switchs alteration approved final ok
Final8/23/20168/23/20168/23/2016PPART
DetailsRock A. Hudson
Seth-partial office equipement Phone #: ###-####
1st floor switches in furniture installed is boxes. OK to occupy
Final8/19/20168/19/20168/19/2016PPART
DetailsRock A. Hudson
Sath Phone #: ###-#### All complete except switches in rooms previously noted. Contractor to pull seperate permit for that work. Contractor to call in permenant service for street lighting on permit ELE 16-00507 and final on that permit and request final for site lighting permit ELE15-02401
Final8/16/20168/16/20168/16/2016PNR
DetailsRock A. Hudson
Seth Phone #: ###-#### Previous corrections have not been made.
Final8/11/20168/12/20168/12/2016APART
DetailsRock A. Hudson
Seth ###-#### Check switches have been removed.
Switches romoved. Temp occupancy OK
Final8/10/20168/11/20168/11/2016APART
DetailsRock A. Hudson
Zach Phone #: ###-####
As per Daryl DeGrange owner agrees to remove switch located in furniture and it shall remain out until acceptable solution has been reached. Temp occupancy OK
Final8/9/20168/10/20168/10/2016ANR
DetailsRock A. Hudson
Steve Phone #: ###-####
Need to produce listing for furniture in guest rooms. Bond parking lot poles, covers for sign junction boxes in stairways, replace modified cover on HVAC unit FC6.
For TCO cord assembly in furniture must provide listing, field evaluate , or completely remove.
Final8/8/20168/9/20168/9/2016AFAIL
DetailsRock A. Hudson
Seth Phone #: ###-####
110.3- Furniture with electrical installed as part of furniture shall be listed.
110.27(A)- Switches operating at 50 volts or more shall be guarded against accidental contact by approved enclosures. Light switches for lights mounted in furniture.
314.20- Boxes mounted in a combustible material shall be flush or have extension ring installed.
314.29- Boxes located behind furniture fixed in place shall be accessible. Behind TV panel.
400.9- Flexible cords shall be installed in continuous lengths without a splice or tap.
Conference8/8/20168/8/20168/8/2016PDONE
DetailsRock A. Hudson
Seth Phone #: ###-####
Discussed pool final needed. Checked history because another inspector started job and I took over 1/2 way through. Notes exist for all inspections needed for pool, shell, perimeter bond, all metallic rails and ladders, Final has not been done yet. Reliant Electric responsible party on all associated wiring for pool. A seperate BLD permit exists for pool. BLD15-02068. Contractor to call to correct issue and will provide permit for pool
Electrical Rough-In8/5/20168/5/20168/5/2016PPASS
DetailsRock A. Hudson
Seth Phone #: ###-####
Kitchen grid and front covered entrance lid rough in ok cover
Electrical Rough-In8/4/20168/4/20168/4/2016PPASS
DetailsEric Story
Seth Phone #: ###-####
laundry/office/work area /server room suspended cielings only ok cover(u/f cable was still in place in front entry. Seth said he would make sure to havee it looked at) Discussed lobby area for a temp occ. No devices trimmed out and some missing lights.
Electrical Rough-In8/2/20168/3/20168/3/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
Level 1 Front office covered prior to inspection. Outdoor covered entrance to shange UF to MC where attached to building surface as per 334.12, Back corridor grid rough in ok cover
Electrical Rough-In8/1/20168/2/20168/2/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
Main lobby and breakfast area grid rough in ok cover
Electrical Rough-In7/27/20167/28/20167/28/2016ANH
DetailsRock A. Hudson
Seth Phone #: ###-#### Called left message, waited 10 minutes. must recall
Electrical Rough-In7/19/20167/20/20167/20/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
1st floor meeting rm and corridor grid rough in ok cover
Electrical Rough-In7/18/20167/19/20167/19/2016APASS
DetailsRock A. Hudson
Zett Phone #: ###-####
Discussed how to support recessed cans in 4x4 grid. Connect to grid where posiible and hang by support wires where needed.
1st floor ok for furniture in guest rooms.
Conference7/15/20167/15/20167/15/2016PDONE
DetailsRock A. Hudson
Thac Phone #: ###-####090
Discusses the access to disconnecting means of HVAC equipment and duct heaters. As per Daryl DeGrange need 24" deep if possible in no case access be less than 18".
Electrical Rough-In7/14/20167/14/20167/14/2016PPASS
DetailsJames Ady
Seth Phone #: ###-#### Conference room Hard lid and fitness room T grid ok to cover
Electrical Rough-In7/7/20167/7/20167/7/2016PPASS
DetailsRock A. Hudson
Sath Phone #: ###-####
Potting rough in ok cover
Final7/6/20167/6/20167/6/2016PCANC
DetailsBob Reichert
Zach Phone #: ###-#### see ri
Electrical Rough-In7/6/20167/6/20167/6/2016PPASS
DetailsBob Reichert
Zach Phone #: ###-#### ok cover vestibule at front entry, 2nd floor ceiling in hall, 2nd floor rooms for furniture, NOTE: furniture not listed, and installed on south 1/2 for all but 6 rooms, ok install rest of furniture
Electrical Rough-In6/28/20166/29/20166/29/2016APASS
DetailsRock A. Hudson
3rd fl corridor - Seth Phone #: ###-#### 3rd floor corridor grid rough in ok cover
Electrical Rough-In6/28/20166/28/20166/28/2016PPASS
DetailsJames Ady
Seth Phone #: ###-#### East end main lobby hard lid, 4th floor t grid only, ok to cover
Electrical Rough-In6/27/20166/27/20166/27/2016PPASS
DetailsJames Ady
Pool - Seth Phone #: ###-#### Pool area ceiling only. Rough in ok to cover
Electrical Rough-In6/23/20166/23/20166/23/2016PPASS
DetailsJames Ady
Phone #: ###-#### Breakfast area, Pool Restrooms, and 1st floor corridor Hard lid ok to cover
Electrical Rough-In6/17/20166/17/20166/17/2016PPASS
DetailsDaryl DeGrange
Phone #: ###-#### rough-in ok cover 1st floor west wing public rest room hard ceiling and ok install built-in funiture in rooms 307,310,311,312,313
Electrical Rough-In6/15/20166/16/20166/16/2016APASS
DetailsDaryl DeGrange
Zach Phone #: ###-#### Rough-in ok cover mechanical room and ok to install built-in funiture in all rooms of 3rd floor except rooms 307,310,311,312,313 No access. All other guest rooms plug tested on 3rd floor.
Final6/14/20166/14/20166/14/2016PPART
DetailsDaryl DeGrange
Seth Phone #: ###-#### Temporary occupancy for 4th floor to move build-in furniture into dwelling units only.
Electrical Rough-In6/13/20166/13/20166/13/2016PPASS
DetailsDaryl DeGrange
Seth Phone #: ###-#### Rough-in ok cover elevator equipment room ceiling
Electrical Rough-In6/8/20166/9/20166/9/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
2nd floor corridor drop hard lid rough in ok cover
Electrical Rough-In6/6/20166/7/20166/7/2016APASS
DetailsRock A. Hudson
first floor laundry - Seth Phone #: ###-####
Laundry area walls, Elevator equipment room, 100, 102, 103, 104, 105, 107, 109, 110, and storage room 1st floor hards rough in ok cover. Discussed if can start to furnish rooms prior to inspections. Told if furnishings cover receptacles they will be required to move all in front of electrical outlets. Also can do walk throughs on rooms when ready to check off for furnishings.
Electrical Rough-In6/3/20166/3/20166/3/2016PPASS
DetailsEric Story
Seth Phone #: ###-####
Lobby walls only ok cover
Electrical Rough-In6/1/20166/2/20166/2/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
1st floor meeting rm, breakfast area and pantry wall rough in ok cover
Electrical Rough-In5/27/20165/27/20165/27/2016PPASS
DetailsRock A. Hudson
Zack Phone #: ###-####
1st floor exterior wall east 1/2 and conference room walls rough in ok cover
Electrical Rough-In5/20/20165/20/20165/20/2016PPASS
DetailsRock A. Hudson
Seth Phone #: ###-####
3rd and 4th floor corridor drop hardlids rough in ok cover
Electrical Rough-In5/17/20165/18/20165/18/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
Main electrical/ mechanical room walls and hardlid rough in ok cover
Permanent Service5/13/20165/16/20165/16/2016APASS
DetailsRock A. Hudson
Seth Phone #: ###-####
125k rated main with less tha 20k available fault current. p/s u/g n ok
Electrical Rough-In5/12/20165/13/20165/13/2016APASS
DetailsBob Reichert
1st floor, as early as possible - Seth Phone #: ###-#### pool and pool equipment rooms ok cover, walls and ceiling
Electrical Rough-In5/11/20165/12/20165/12/2016APASS
DetailsRex Boyles
Zack Phone #: ###-#### r/i ok rooms 100 thru 106 and 109 and 110, 115 thru 119,143 and 144 Noticed pool receptacles within 6 foot of waters edge, Seth will resolve issue before r/i inspection
Electrical Rough-In5/4/20165/5/20165/5/2016ACANC
DetailsRex Boyles
Seth-wouild like late AM if possible Phone #: ###-####
Electrical Rough-In4/27/20164/27/20164/27/2016PPASS
DetailsRex Boyles
As early as possible - Seth Phone #: ###-#### r/i ok 2nd floor electrical room ok
Electrical Rough-In4/26/20164/26/20164/26/2016PPASS
DetailsRex Boyles
Phone #: ###-#### r/i ok 2nd floor rooms, corridor , telco room, elevator lobby everything except loadcenters and electric room
Electrical Rough-In4/12/20164/13/20164/13/2016APASS
DetailsRex Boyles
Seth Phone #: ###-#### r/i ok 3rd floor elevator lobby and corridor ok. 1st floor ceilings west of elevator shaft also ok
Electrical Rough-In4/11/20164/12/20164/12/2016APASS
DetailsRex Boyles
Seth Phone #: ###-#### r/i ok all 3rd floor rooms only
Electrical Rough-In3/31/20163/31/20163/31/2016PPASS
DetailsRex Boyles
As early as possible // Seth Phone #: ###-#### r/i ok 4th floor electric/telco rm. walls and ceiling, 4th floor elevator lobby walls and ceilings, and east and west stairwells 1st thru 4th floors also ok
Electrical Rough-In3/28/20163/29/20163/29/2016APASS
DetailsRex Boyles
4th floor & roof - Seth Phone #: ###-#### r/i ok all roof penetrations and 4th flr guest rooms walls and ceilings ok
Conference3/15/20163/15/20163/15/2016PDONE
DetailsRex Boyles
Seth Phone #: ###-#### discuss wiring methods. NM cable ok in rooms and from loadcenters to rooms if ran above drywalled corridor, mc cable and conduit in commonareas and feeders will be mc cable. Roof penetrations shall be mc cable transitioned to carflex exiting pitchpockets to RTU's. AFCI protection in rooms and tamper resistant receptacles required inside rooms.
Electrical Rough-In10/28/201510/28/201510/28/2015PPASS
DetailsRex Boyles
Jacob Phone #: ###-#### r/i ok tie 4 corners of pool bond wires to equipotintial grid and handicap lift and corner rail for pool ok
Conference10/26/201510/27/201510/27/2015ADONE
DetailsRex Boyles
Jacob Phone #: ###-#### ct enclosure ok on xformer and main disconnect in MSB ok in locked electrical room with NOX box for EMS and door labeled "electric room", all ok as per plans
Electrical Rough-In10/12/201510/12/201510/12/2015PPASS
DetailsRex Boyles
Jacob Phone #: ###-#### r/i underslab conduits, n. west corner subfeeds ok
Electrical Rough-In10/6/201510/7/201510/7/2015PPASS
DetailsEric Story
Jacob Phone #: ###-#### pool bonding equipotential bonding/light/ladder/handrails ok cover