Final | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PASS |
Eric Story
|
|
|
EQ bond plane wiring Phone #: ###-#### Inspection requested via web by Lars Johnson equipotential bonding ok cover
|
Conference | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | DONE |
Eric Story
|
|
|
EQ bonding plane wiring. Please call 1/2 hr ahead, need to meet on site and discuss eq wire placement. Phone #: ###-#### Inspection requested via web by Lars Johnson discussed bonding for pool and surrounding walls
|
Electrical Rough-In | 10/26/2015 | 10/27/2015 | 10/27/2015 | A | CANC |
Eric Story
|
|
|
EQ bonding plane wiring. Please call 1/2 hr ahead, need to meet on site and discuss eq wire placement. Phone #: ###-#### Inspection requested via web by Lars Johnson needed conference
|
Electrical Rough-In | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Eric Story
|
|
|
Underground for (6) pool lights, (1) spa light, and (1) home run Phone #: ###-#### Inspection requested via web by Lars Johnson underground for pool light underground ok cover
|
Electrical Rough-In | 9/1/2015 | 9/1/2015 | 9/1/2015 | A | PASS |
Bob Reichert
|
|
|
Partial ug ; bonding for swimming pool/spa Phone #: ###-#### Inspection requested via web by Lars Johnson called, conduits for lights only, bonding and partial u/g north side ok cover
|