ELE-Aging Inspection | 5/30/2019 | 5/30/2019 | 6/5/2019 | | PASS |
Tom Saunders
|
|
|
DOC permit expired work done by others on 2017 permit ECO electric
|
DOC - Permit Expired | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Tom Saunders
|
|
|
work was done by others no work done on permit for over 180 days
|
ELE-Aging Inspection | 2/19/2019 | 2/19/2019 | 2/19/2019 | | PASS |
Tom Saunders
|
|
|
still under construction
|
Electrical Rough-In | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | CANC |
Tom Saunders
|
|
|
Shawn Phone #: ###-####...
work done was not by homeowner...hired contractor to do work...contractor needs to schedule inspection
|
Conference | 12/21/2016 | 12/21/2016 | 12/21/2016 | P | DONE |
Tom Saunders
|
|
|
Shawn Phone #: ###-####...
discussed service change options...recommended hiring electrician for job...
|
Conference | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | DONE |
Rock A. Hudson
|
|
|
Shawn Phone #: ###-#### Discussed different new meter bases that are available for subfeed interior panel. Grounding electrodes relocating to new service location, looked at sample pop up receptacle assembly for islant counter top, no tamper, no listing. revisted bathroom receptacle requirements
|
Conference | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | DONE |
Rock A. Hudson
|
|
|
Please call ahead for access - Shawn Phone #: ###-#### Discussed kitchen area, outlet spacing, max circuit load for appliances, dedicated bathroom receptacle circuit, approved boxes and covers for receptacles install in counter top. Discussed service location and type for future 2nd floor apartment. Called and asked Brittney to attach to BLD15-01818
|
Electrical Rough-In | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Kitchen west wall only rough in ok cover
|
Electrical Rough-In | 9/9/2015 | 9/10/2015 | 9/10/2015 | P | CANC |
Eric Story
|
|
|
Shawn Phone #: ###-#### needed conference
|
Conference | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | DONE |
Eric Story
|
|
|
Shawn Phone #: ###-#### discussed wiring of kitchen and requirements needed. and also wiring of house in future and removing jboxes in attic when adding second story
|