Final | 10/14/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher final ok including ceilings final
|
Electrical Rough-In | 10/9/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher r/i corridor wall ok
|
Final | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher final ok
|
Electrical Rough-In | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher r/i walls, and conduit runs ok
|