Final | 10/21/2015 | 10/21/2015 | 10/21/2015 | A | PASS |
Eric Story
|
|
|
Von is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen final ok
|
Permanent Service | 9/24/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Eric Story
|
|
|
John is the contact. Fault Current Report posted at meter location. Phone #: ###-#### Inspection requested via web by Buster Bowen p/s/u/g n ok
|
Permanent Service | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | FAIL |
Eric Story
|
|
|
Service inspection for 100 amp single phase. John is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 110.24 available fault current calculation needed
|