Final | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | PASS |
Rex Boyles
|
|
|
Homeowner will be home. Final of new addition Phone #: ###-#### Inspection requested via web by Steve Craig final ok
|
Electrical Rough-In | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | PASS |
Rex Boyles
|
|
|
Inspection of electric floor heat cable Phone #: ###-#### Inspection requested via web by Steve Craig r/i floor heat ok
|
Rough-In Permanent Service | 9/29/2015 | 9/30/2015 | 9/30/2015 | P | PASS |
Eric Story
|
|
|
Idaho Power will disconnect this service at 11:00 am. I am planning to have the new 200 amp service connected early afternoon. Please call Steve at ###-#### to discuss inspection timing. Phone #: ###-#### Inspection requested via web by Steve Craig verify grounding bushing feeding detached garage at both ends also check for back to back panel if changed to a j-box p/s o/h rec ok
|
Electrical Rough-In | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Rex Boyles
|
|
|
Rough in of new addition Inspection requested via web by Steve Craig r/i addition ok
|