Final | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by PAT MILLER Final ok
|
Electrical Rough-In | 8/14/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Eric Story
|
|
|
call first for access ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER Main floor ok cover
|
Electrical Rough-In | 7/6/2017 | 7/6/2017 | 7/6/2017 | A | FAIL |
Eric Story
|
|
|
call first, Pat ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER All existing wiring stapled and open splices on face of studs shall all be removed proir to rough-in and cover....
|
Electrical Rough-In | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PASS |
Eric Story
|
|
|
call first, ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER upstairs only ok cover
|
Rough-In Permanent Service | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Rex Boyles
|
|
|
call first, ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER r/i not needed at this time p/s o/h rec ok
|