Electrical Rough-In | 10/15/2015 | 10/16/2015 | 10/16/2015 | A | PASS |
Rex Boyles
|
|
|
ceiling cover inspection Phone #: ###-#### Inspection requested via web by Don Lustig r/i t bar ceiling ok
|
Final | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Rex Boyles
|
|
|
ceiling cover inspection Phone #: ###-#### Inspection requested via web by Don Lustig final ok new bathroom
|
Conference | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | DONE |
Rex Boyles
|
|
|
we are changing the main feeders out monday night and are requesting a conference before hand. steve is on site today please stop by for a quick consult. thanks Phone #: ###-#### Inspection requested via web by Don Lustig discuss service upgrade requirements, grounding (add rod) , or find existing in addition to water pipe. Label available fault current on pull box, Meet wire bending and wire fill in existing gutter.
|
Permanent Service | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Rex Boyles
|
|
|
we are changing the main feeders out monday night and are requesting a conference before hand. steve is on site today please stop by for a quick consult. thanks Phone #: ###-#### Inspection requested via web by Don Lustig p/s u/g rec ok ok to re energize service. Inspected existing service ground to be re used for upgrade on 10/9/15. Will add supplemental ground rod as per conference. Will label pull box with available fault current as per conference. Contractor will be doing shutdown after hours. City of Boise will inspect following morning after work completed.
|
Electrical Rough-In | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Rex Boyles
|
|
|
need wall cover call steve if he is not on site thanks Phone #: ###-#### Inspection requested via web by Don Lustig r/i ok bathroom walls and ceiling
|