Final | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Eric Story
|
|
|
For master bathroom. Front door is open Phone #: ###-#### Inspection requested via web by Bob Glenn master bath final ok
|
Electrical Rough-In | 9/29/2015 | 9/30/2015 | 9/30/2015 | A | PASS |
Eric Story
|
|
|
Michael Phone #: ###-#### up bath floor heat ok cover
|
Electrical Rough-In | 9/29/2015 | 9/29/2015 | 9/29/2015 | A | FAIL |
Eric Story
|
|
|
Floor heat in the bathroom upstairs Phone #: ###-#### Inspection requested via web by Bob Glenn 110.21 floor heat shall be installed as per manufacturers installation instruction(cold splice cannot be installed in wall
|
Electrical Rough-In | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Eric Story
|
|
|
ANY ? CALL BOB ###-#### Phone #: ###-#### Inspection requested via web by Bob Glenn main level bathroom ok cover
|