Final | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
Rough-In Permanent Service | 3/14/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn rough-in p/s u/g n ok
|
Electrical Rough-In | 3/10/2016 | 3/10/2016 | 3/10/2016 | A | PASS |
Daryl DeGrange
|
|
|
underground bonding of pool apron around edge of pool. Thanks Phone #: ###-#### Inspection requested via web by Darryn Coburn rough-in ok cover perimeter equipotential bonding
|
Electrical Rough-In | 2/10/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Bob Reichert
|
|
|
Underground pipework. Thanks Phone #: ###-#### Inspection requested via web by Darryn Coburn ok cover u/g inside pool house only
|
Electrical Rough-In | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Bob Reichert
|
|
|
Bonding of pool grid. Thanks! Phone #: ###-#### Inspection requested via web by Darryn Coburn pool bond only ok
|