Final | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PASS |
Rock A. Hudson
|
|
|
Final ok
|
Electrical Rough-In | 12/10/2015 | 12/14/2015 | 12/14/2015 | A | CANC |
Rock A. Hudson
|
|
|
Pat Phone #: ###-#### Needed final inspection
|
Final | 12/9/2015 | 12/10/2015 | 12/10/2015 | P | FAIL |
Rock A. Hudson
|
|
|
Pat Phone #: ###-#### 1/2 receptacles outlets not working to a high leg off transformer. Contractor just put in proposal for transformer change out
|
Electrical Rough-In | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Rock A. Hudson
|
|
|
Pat Phone #: ###-#### Wall dividing large room into small wood shop and a classroom. Wall rough in ok cover
|