Final | 2/1/2016 | 2/2/2016 | 2/2/2016 | A | PASS |
Eric Story
|
|
|
Correction notice has been finished
Phone #: ###-#### Inspection requested via web by John Harvey corrections fixed final ok
|
Final | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | FAIL |
Eric Story
|
|
|
John is on site Phone #: ###-#### Inspection requested via web by John Harvey 406.4 (5) tamper resistant receptaces required(master bath) 406.5 receptacle mounting shall be secured 406.9 receptacles intalled in a wet location shall be rated 422.31 permanently installed appliances shall a means of lock out trim out buried receptacles
|
Rough-In Permanent Service | 1/20/2016 | 1/20/2016 | 1/21/2016 | P | PASS |
Eric Story
|
|
|
James is on site Phone #: ###-#### Inspection requested via web by John Harvey rough-in ok p/s o/h rec ok
|
Electrical Rough-In | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Eric Story
|
|
|
House is open. Master floor heat rough in only
Thanks Phone #: ###-#### Inspection requested via web by John Harvey master bath floor heat ok cover
|
Electrical Rough-In | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Eric Story
|
|
|
Corrections are made. Three electrical boxes added and stapling corrected.
Call Tim if any issues. John is out of town right now. Thanks Phone #: ###-#### Inspection requested via web by John Harvey corrections fixed rough-in ok cover
|
Electrical Rough-In | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | FAIL |
Eric Story
|
|
|
John is currently out of town. Please call general contractor Tim if any issues
Rough in only of residence Meter will be set on garage at a later date.
Phone #: ###-#### Inspection requested via web by John Harvey 210.52 (2) wall space greater then 24" requires a receptacle aswell as master bed entry if a hall longer then 10' requires a receptacle 334.30 NM cable shall be supported with 12" of a box and shall not be stapled on edge
|