Final | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Rex Boyles
|
|
|
Brian Phone #: ###-#### final ok upst. and dnst. bathrooms, entry recep.s and lights and new loadcenter upst.
|
Electrical Rough-In | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Eric Story
|
|
|
Ryan Phone #: ###-#### entry/vestible ok cover
|
Electrical Rough-In | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Eric Story
|
|
|
Bryan Phone #: ###-#### down bath hard lid and wall ok cover
|
Electrical Rough-In | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Rex Boyles
|
|
|
Bryan Phone #: ###-#### r/i ok 2 upst. bathrooms ok to cover
|
Electrical Rough-In | 10/8/2015 | 10/9/2015 | 10/9/2015 | P | CANC |
Eric Story
|
|
|
Bryan Phone #: ###-#### canceled on 10-8-15
|