Final | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | PASS |
Eric Story
|
|
|
Back door should be open Phone #: ###-#### Inspection requested via web by Troy Cobb final ok
|
Electrical Rough-In | 10/14/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Eric Story
|
|
|
Basement remodel is ready for rough-in insp. Back door is unlocked. If you call me when you are heading that way I can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb basement rough-in ok cover
|
Rough-In Permanent Service | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | CANC |
Eric Story
|
|
|
New Service and Sub panel ready to be powered up, will call for final when other circuits are hooked up. Back door should be unlocked. Sub panel in basement below main panel, Old Fuse box in stairway has been gutted and turned into J-box. Phone #: ###-#### Inspection requested via web by Troy Cobb just p/s at this moment
|
Permanent Service | 10/14/2015 | 10/14/2015 | 10/14/2015 | P | PASS |
Eric Story
|
|
|
New Service and Sub panel ready to be powered up, will call for final when other circuits are hooked up. Back door should be unlocked. Sub panel in basement below main panel, Old Fuse box in stairway has been gutted and turned into J-box. Phone #: ###-#### Inspection requested via web by Troy Cobb p/s o/h rec ok
|