Final | 12/11/2015 | 12/11/2015 | 12/11/2015 | A | PASS |
Rex Boyles
|
|
|
Mike M. On site. Phone #: ###-#### Inspection requested via web by Brian Caruso corrections made final ok
|
Final | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | NR |
Bob Reichert
|
|
|
Mike McCarrel is on site....###-#### Phone #: ###-#### Inspection requested via web by Brian Caruso met contractor, shall add bath gfci, plates, labels, etc
|
Electrical Rough-In | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Bob Reichert
|
|
|
This is a ceiling inspection.......Mike M. on site-###-#### Phone #: ###-#### Inspection requested via web by Brian Caruso ok cover ceiling
|
Electrical Rough-In | 12/1/2015 | 12/2/2015 | 12/2/2015 | A | PART |
Bob Reichert
|
|
|
Mike is on site...This is a ceiling inspection. Phone #: ###-#### Inspection requested via web by Brian Caruso ok cover part ceiling anop
|
Electrical Rough-In | 11/9/2015 | 11/9/2015 | 11/9/2015 | P | PASS |
Rex Boyles
|
|
|
Mike McCarrol is on site. Phone #: ###-#### Inspection requested via web by Brian Caruso r/i wall with loadcenters ok to cover
|
Permanent Service | 11/5/2015 | 11/5/2015 | 11/5/2015 | P | PASS |
Rex Boyles
|
|
|
Daven Story is on site. early afternoon would be great. Phone #: ###-#### Inspection requested via web by Brian Caruso corrections made p/s u/g n ok 400 amp ct meter base
|
Permanent Service | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | CANC |
Eric Story
|
|
|
Daven and Mike are on site. Phone #: ###-#### Inspection requested via web by Brian Caruso still needs avaliable fault current calculation
|
Electrical Rough-In | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Rex Boyles
|
|
|
Brian Phone #: ###-#### r/i walls ok except wall with panels in rear
|