Final | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | PASS |
Rock A. Hudson
|
|
|
Tom Phone #: ###-#### Final ok
|
Final | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Tom Phone #: ###-#### 352.30- PVC conduit shall be secured with in 3' of boxes. Ground shall not be only method.
|
Electrical Rough-In | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### IMC installed underground and to change to PVC just above ground to box. Bonding of IMC to be in ground box where conduit all originate. Underground rough in ok cover.
|
Conference | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | DONE |
Rock A. Hudson
|
|
|
Call 30 mins before // Tom Phone #: ###-#### Discussed addition of underground to northside for 4 120 volt receptacle outlets for fire vehicles
|