Final | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Daryl DeGrange
|
|
|
Final ok
|
Rough-In Permanent Service | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Rex Boyles
|
|
|
Please call Dan at ###-#### 45mins. before arrival for access. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell r/i ok p/s u/g n ok qwest pedestal
|
Final | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Rex Boyles
|
|
|
Please call Dan at ###-#### 45mins. before arrival for access. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell final ok
|
Final | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | CANC |
Eric Story
|
|
|
This site is located on the north side of overland, just east of the pushing lot of Boise Tint Shop''s parking lot. Phone #: ###-#### Inspection requested via web by Dan Mitchell could not access panel or coolped
|
Electrical Rough-In | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | CANC |
Eric Story
|
|
|
This site is located on the north side of overland, just east of the pushing lot of Boise Tint Shop''s parking lot. Phone #: ###-#### Inspection requested via web by Dan Mitchell could not access panels
|