Final | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PASS |
Eric Story
|
|
|
Everything should be complete for you now thanks for being patient Phone #: ###-#### Inspection requested via web by Brad Baker final ok
|
Final | 1/20/2016 | 1/20/2016 | 1/20/2016 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Baker not ready
|
Final | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | CANC |
Eric Story
|
|
|
If possible make it the last inspection of the day, they would like a final and we have a few more things to wrap up thank you Phone #: ###-#### Inspection requested via web by Brad Baker contractor not ready
|
Electrical Rough-In | 12/9/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Eric Story
|
|
|
Walls for cover Phone #: ###-#### Inspection requested via web by Brad Baker walls only ok cover
|
Permanent Service | 10/23/2015 | 10/23/2015 | 10/23/2015 | P | PASS |
Eric Story
|
|
|
Corrections have been made Phone #: ###-#### Inspection requested via web by Brad Baker p/s o/h rec ok
|
Permanent Service | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | FAIL |
Eric Story
|
|
|
Replaced the service and need to energize to provide power for construction Phone #: ###-#### Inspection requested via web by Brad Baker 250.28 main bonding jumper 250.53(3) supplemental ground rod required
|