Final | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Rex Boyles
|
|
|
GM on the project is Mike ###-####, he can provide access. Phone #: ###-#### Inspection requested via web by Clint Tate corrections made final ok
|
Electrical Rough-In | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | PASS |
Rex Boyles
|
|
|
Mike ###-#### Inspection requested via web by Clint Tate correction made to washer circuit.. Still need to either bond water pipe as per 250.68 C 1. If plumbing is pex type then additional ground rod required. Will look for this at final inspection.
|
Electrical Rough-In | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Contact is Mike ###-#### Phone #: ###-#### Inspection requested via web by Clint Tate 210.11(C)(2)- 120 volt 20 amp laundry circuit shall have no other outlets. 250.53(A)(2)- Where water bond has been removed supplemental grounding electrode required. A single ground rod shall be supplemented by additional rod.
|