Final | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn final ok
|
Rough-In Permanent Service | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
|
Rough-In Permanent Service | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn 300.4- Where NM cable ran through bored holes that do not maintain 1 1/4" from framing surface thay shall be protected from physical damage by nail plates. 300.5- Underground direct burial conductors shall be protected to a minimum depth shown in 300.5. Job will not pass until temp pole set properly.
|