Final | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | PASS |
Bob Reichert
|
|
|
Ready now Phone #: ###-#### Inspection requested via web by mike brown ok final, gate requires new permit
|
Final | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | CANC |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by mike brown needed r/i
|
Electrical Rough-In | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by mike brown r/i ok interior
|
Electrical Rough-In | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PASS |
Daryl DeGrange
|
|
|
Soffit inspection and conference on light switches Phone #: ###-#### Inspection requested via web by mike brown WUI ZONE A Rough-in ok cover exterior soffits, no recessed cans. Only 2 hr. rated nailon boxes.
|
Permanent Service | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | PASS |
Bob Reichert
|
|
|
There is a temporary platform for inspection and service at this point. They will pour concrete and install a permanent deck for final electrical inspection. Please call with any questions or concerns while on site. ###-#### Phone #: ###-#### Inspection requested via web by mike brown p/s u/g n ok
|
Conference | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | DONE |
Eric Story
|
|
|
please call rick to meet and review service options. call 15 min ahead please Phone #: ###-#### Inspection requested via web by mike brown discussed meter location and clearences should not be a issue. builder is building a platform for meter to be set a 5'6" will give required clearences
|