Final | 12/30/2015 | 12/31/2015 | 12/31/2015 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Final ok
|
Rough-In Permanent Service | 11/5/2015 | 11/6/2015 | 11/6/2015 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov corrections fixed rough-in ok cover p/s u/g n ok 5 meters
|
Rough-In Permanent Service | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov 110.3- Strain relief for sub feed SER at service, clamp shall be snug on SER cable. 110.14- All strands of grounding conductor for range in unit 201 shall terminate in bus bar. 300.4- Where NM cable passes through bored holes that do not maintain 1 1/4" from framing surface they shall be protected from physical damage by nail plates. 408.7- Unused breaker openings shall be closed. 590.6- All temp receptacles shall have GFCI protection. Unable to verify.
|
Rough-In Permanent Service | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov Inspection cancelled from web by: daniel bibikov
|