Final | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Rock A. Hudson
|
|
|
Final ok
|
Final | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | FAIL |
Rock A. Hudson
|
|
|
We need to get a final inspection on this project. We have a few irreversible crimps that need to be completed and we are waiting for the proper die which should be delivered to our shop by 10:30 this morning. We should hopefully be ready for an inspection by early afternoon. Please coordinate with Tony ###-####. Thanks, Sean Phone #: ###-#### Inspection requested via web by Kevin Perez 240.15(B)(1)-Multiwire branch circuits shall have handle ties to ensure all ungrounded conductors are turned of all at once. 680.21(C)- Circulating system receptacle 120 through 240 volt shall have GFCI protection.
|