Final | 12/4/2015 | 12/7/2015 | 12/7/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Sellman final ok
|
Final | 11/30/2015 | 12/1/2015 | 12/1/2015 | A | NR |
Rex Boyles
|
|
|
Please call Todd Sellman to gain access to the gear room. Phone #: ###-#### Inspection requested via web by Todd Sellman not ready for final until we see sub panel complete after swap over
|
Electrical Rough-In | 12/1/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Rex Boyles
|
|
|
Please call Todd Sellman to gain access to the gear room. Phone #: ###-#### Inspection requested via web by Todd Sellman follow up insp. for terminations in main disconnect ok ready for meter
|
Rough-In Permanent Service | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Rex Boyles
|
|
|
Contact on site is Tim Cope Phone #: ###-#### Inspection requested via web by Todd Sellman r/i ok p/s u/g n ok 3phase 100 amp meter base and disconnect added to existing switchgear Todd will get avilable fault current label for existing gear before final insp.
|