Final | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PASS |
Mark Moncarr
|
|
|
Jay Phone #: ###-#### Corrections made. Ok final
|
Final | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | FAIL |
Mark Moncarr
|
|
|
Call 30 minutes before // Jay Phone #: ###-#### 1. Outlet at end of peninsula needs to be GFI protected. 2. Light hanging in kitchen needs fully attached to box supporting it. 3. All outlets need to be Tamper resistant. 4. Breaker lockout needed for hard wired dishwasher. 5. Smoke detectors need to be on Arc fault breaker.
|
Electrical Rough-In | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
James Ady
|
|
|
Jay Phone #: ###-#### Rough in ok to cover
|
Conference | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | DONE |
James Ady
|
|
|
Jay Phone #: ###-#### Spoke about Lock outs on permenently installed apliances, NM cable supports, bored holes, Service outlet for mini split A/C
|
Conference | 11/27/2015 | 11/27/2015 | 11/27/2015 | P | DONE |
Eric Story
|
|
|
Please call ahead for access - Jay Phone #: ###-#### discussed wiring for in-laws quarters and all nec requirements related to project
|