Final | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | PASS |
Mark Moncarr
|
|
|
Mitchell Phone #: ###-#### final ok
|
Electrical Rough-In | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
James Ady
|
|
|
Mitch Phone #: ###-#### Dog wash room Rough in ok
|
Electrical Rough-In | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Eric Story
|
|
|
Mitch Phone #: ###-#### detached garage ok cover
|
Electrical Rough-In | 3/15/2016 | 3/16/2016 | 3/16/2016 | P | CANC |
Eric Story
|
|
|
Mitchell Phone #: ###-#### home owner not ready
|
Electrical Rough-In | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | CANC |
Eric Story
|
|
|
Mitchell Phone #: ###-#### needed conference
|
Conference | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | DONE |
Eric Story
|
|
|
Mitchell Phone #: ###-#### discussed proper OCPD for receptacles/homeowner will change circuit breakers to 15amp due to wiring lights with 12gauge and 14gauge together. Alos discussed tyying all grounds together in boxes and minimum for electrical requirements needed to procide
|
Rough-In Permanent Service | 12/28/2015 | 12/29/2015 | 12/29/2015 | A | PASS |
Eric Story
|
|
|
Mitch Phone #: ###-#### corrections fixed p/s o/h rec ok
|
Rough-In Permanent Service | 12/24/2015 | 12/28/2015 | 12/28/2015 | P | FAIL |
Eric Story
|
|
|
Mitch Phone #: 310###-#### unused openings shall be closed/ 250.50 grounding electrode system required(concrete encased electrode shall be grounded at each main discconect)
|
Rough-In Permanent Service | 12/15/2015 | 12/23/2015 | 12/23/2015 | P | CANC |
Eric Story
|
|
|
Mitch Phone #: ###-#### homeowner not ready
|
Electrical Rough-In | 12/9/2015 | 12/10/2015 | 12/10/2015 | A | PASS |
Eric Story
|
|
|
Mitch Phone #: ###-#### underground ok cover
|