Final | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack ok final
|
Electrical Rough-In | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Bob Reichert
|
|
|
Equipotetial bonding Phone #: ###-#### Inspection requested via web by Lee VanSchoiack equipotential bond ok
|
Electrical Rough-In | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | NR |
Eric Story
|
|
|
equipotential grid Phone #: ###-#### Inspection requested via web by Lee VanSchoiack bond wire not installed
|
Electrical Rough-In | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Bob Reichert
|
|
|
ug conduit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack ok cover u/g conduit
|
Electrical Rough-In | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | PASS |
Bob Reichert
|
|
|
Pool bonding Phone #: ###-#### Inspection requested via web by Lee VanSchoiack pool bond ok, will call for equipotential plane later
|
Electrical Rough-In | 12/1/2015 | 12/2/2015 | 12/2/2015 | P | NR |
Bob Reichert
|
|
|
pool bonding Phone #: ###-#### Inspection requested via web by Lee VanSchoiack met pool guy, asked for electrican to recall for am
|