Final | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Bob Reichert
|
|
|
request early/first inspection - Joseph Phone #: ###-#### ok final
|
Final | 12/31/2015 | 1/4/2016 | 1/4/2016 | A | PART |
Bob Reichert
|
|
|
Joseph Phone #: ###-#### owner moved in, switches and receptacles work ok, told owner to call back for visual inspection after tile installed in kitchen area
|
Final | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | CANC |
Bob Reichert
|
|
|
Homeowner is finishing the work // Joseph Phone #: ###-#### see conference
|
Conference | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | DONE |
Bob Reichert
|
|
|
Homeowner is finishing the work // Joseph Phone #: ###-#### talked about finishing the work that Mitchell electric did for rough in
|