Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Daryl DeGrange
|
|
|
Final inspection for B2 ; 3 mask remodel project. Phone #: ###-#### Inspection requested via web by Steve Moss final ok
|
Electrical Rough-In | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Bob Reichert
|
|
|
rough-in walk thru of construction project before ceiling is complete. Phone #: ###-#### Inspection requested via web by Steve Moss ok cover ceilings in mechanical and office areas
|
Electrical Rough-In | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PASS |
Bob Reichert
|
|
|
need more walls inspected so sheet rock work can continue. Phone #: ###-#### Inspection requested via web by Steve Moss bldg 3 admin walls only ok cover
|
Electrical Rough-In | 12/15/2015 | 12/16/2015 | 12/16/2015 | A | PART |
Bob Reichert
|
|
|
I need a rough-in inspection in one area of this remodel so the sheet rock can be installed. Phone #: ###-#### Inspection requested via web by Steve Moss bldg 3, area 9 walls only ok cover walls
|