Final | 2/7/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Daryl DeGrange
|
|
|
Final ok
|
Electrical Rough-In | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Bob Reichert
|
|
|
Underground Inspection at the NE Corner of Building 50. PM inspection preferred. Contact Pierre Elskamp Phone #: ###-#### Inspection requested via web by Cathy Duchek ok cover duct bank NE part Bldg 51 from existing duct bank between 50 and 51 going out to substation NE direction
|
Electrical Rough-In | 5/9/2016 | 5/9/2016 | 5/9/2016 | A | PASS |
Daryl DeGrange
|
|
|
Underground inspection at the NE corner of Building 51. Contact Ben Bagley. Phone #: ###-#### Inspection requested via web by Cathy Duchek Rough-in ok cover 30 ft. stub medium voltage conduits at N.E. corner of building 51
|
Electrical Rough-In | 5/4/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Daryl DeGrange
|
|
|
Underground inspection by building 51 Contact Ben Bagley Phone #: ###-#### Inspection requested via web by Cathy Duchek Rough-in ok cover 100 ft trench at NE entrance data coduits to vault 301
|
Electrical Rough-In | 3/21/2016 | 3/22/2016 | 3/22/2016 | P | PASS |
Bob Reichert
|
|
|
Rough-in Underground inspection to cover by the NW corner of Building 51. Contact Benn Bagley Phone #: ###-#### Inspection requested via web by Cathy Duchek ok cover u/g as requested
|
Electrical Rough-In | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | PASS |
Daryl DeGrange
|
|
|
Duct Bank Inspection on SW Corner of Building 50. Contact Pierre Elskamp. Phone #: ###-#### Inspection requested via web by Cathy Duchek Rough-in ok to pour first 30 ft. from SW corner of building 50
|
Electrical Rough-In | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | PASS |
Bob Reichert
|
|
|
Underground Inspection. Contact Pierre Elskamp Phone #: ###-#### Inspection requested via web by Cathy Duchek ok cover u/g for relocating lighting panel east of Bldg #51
|
Electrical Rough-In | 1/19/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Bob Reichert
|
|
|
Underground Inspection between Bldg 36 and Bldg 50. Contact Pierre Elskamp. Phone #: ###-#### Inspection requested via web by Cathy Duchek ok cover u/g at roadway for new road at west end
|
Electrical Rough-In | 1/13/2016 | 1/14/2016 | 1/14/2016 | A | CANC |
Bob Reichert
|
|
|
Partial Underground Inspection at the corner of Bldg 36 and Bldg 50 Contact Pierre Elskamp Phone #: ###-#### Inspection requested via web by Cathy Duchek called contractor to explain that customer must get bld and or fees current per instructions from 445
|
Electrical Rough-In | 12/15/2015 | 12/16/2015 | 12/16/2015 | A | PART |
Bob Reichert
|
|
|
Inspection for Duct Bank at the S Wall of Building 50. Contact Pierre Elskamp. Phone #: ###-#### Inspection requested via web by Cathy Duchek south wall bldg 50 u/g for med and low voltage ok cover
|