Final | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | PASS |
Daryl DeGrange
|
|
|
Jake is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates correction done, final ok
|
Final | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | CANC |
Rock A. Hudson
|
|
|
Jake is the contact his cell no. is ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Final | 4/27/2016 | 4/29/2016 | 4/29/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 250.30- Common neutral bar and transfer switch, non seperately derived system, Seperate grounds and neutral at generator.
|
Electrical Rough-In | 3/29/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection. Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Grid rough in ok cover
|
Electrical Rough-In | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Rock A. Hudson
|
|
|
Underground inspection. Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Underground to generator to be covered by concrete due to shallow at footing. Rough in ok cover
|
Electrical Rough-In | 2/10/2016 | 2/12/2016 | 2/12/2016 | A | PASS |
Rock A. Hudson
|
|
|
Jake is the contact Phone #: ###-#### Inspection requested via web by Shawna Gates Dental oral surgeon. Wall and hardlid rough in ok cover
|
Electrical Rough-In | 2/10/2016 | 2/12/2016 | 2/10/2016 | P | CANC |
Rock A. Hudson
|
|
|
Jake is the contact Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|