Final | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jay Symonds final ok
|
Electrical Rough-In | 6/1/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Jay Symonds Walls and hard lids only ok cover
|
Permanent Service | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Jay Symonds corrections fixed p/s u/g n ok 3-phase meter
|
Permanent Service | 12/20/2015 | 12/21/2015 | 12/21/2015 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Jay Symonds110.24 available fault calculation shall be posted/250.30(6) grounding elecrode for seperatly derived systems required
|