Final | 2/1/2016 | 2/2/2016 | 2/2/2016 | A | PASS |
Bob Reichert
|
|
|
early if possible 8:00 to 9:00 Phone #: ###-#### Inspection requested via web by Dan Rohl ok final
|
Electrical Rough-In | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PASS |
Bob Reichert
|
|
|
Floor Heat tile man will be there to let you in Phone #: ###-#### Inspection requested via web by Dan Rohl ok cover floor heat only
|
Electrical Rough-In | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Bob Reichert
|
|
|
please call Andy at ###-####. best time would be from 8:00 to 10:00 for access. Phone #: ###-#### Inspection requested via web by Dan Rohl ri up bath ok
|