Final | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Demo work only. Final ok
|
Electrical Rough-In | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | PASS |
Rex Boyles
|
|
|
Basement ; 4th Floor Late morning if possible please Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok new bsmt. walls and 4th floor t grid ceilings
|
Electrical Rough-In | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton ok cover walls only sw and west offices
|
Electrical Rough-In | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Eric Story
|
|
|
1st Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton 1st floor area walked with kip walls only ok cover
|
Conference | 1/11/2016 | 1/13/2016 | 1/13/2016 | A | DONE |
Eric Story
|
|
|
Roger Bachman Phone #: ###-#### Inspection requested via web by Kerri Hamilton discussed existing panel boards and demo on job as well as scope of work
|