Final | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Rex Boyles
|
|
|
Bill Phone #: ###-#### final ok
|
Permanent Service | 1/26/2016 | 1/26/2016 | 1/26/2016 | P | PASS |
Rex Boyles
|
|
|
Bill Phone #: ###-#### p/s o/h rec ok
|
Conference | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | DONE |
Rock A. Hudson
|
|
|
Bill Phone #: ###-#### Discussed service change. Will maintain 2' of more from gas meter. Installing meter panel combo. Old panel location in bathroom to change to junction point. All grounding type receptacle outlets to be GFCI protected or changed to ungrounded receptacles. Adding receptacles in bathroom and kitchen for refrigerator and counter to left of refer. Also changing light fixtures
|