Final | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | PASS |
Bob Reichert
|
|
|
Peter Phone #: ###-#### ok final
|
Electrical Rough-In | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | PASS |
Bob Reichert
|
|
|
Peter Phone #: ###-#### ok cover mbr, bath
|
Electrical Rough-In | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PASS |
Bob Reichert
|
|
|
Peter-would like as early as possible Phone #: ###-#### upper bath ok cover
|
Electrical Rough-In | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | NR |
Bob Reichert
|
|
|
Peter Phone #: ###-#### met owner, told to add receptacle and do make-up, staple nm
|
Conference | 1/6/2016 | 1/8/2016 | 1/8/2016 | A | DONE |
Bob Reichert
|
|
|
Peter Phone #: ###-#### talked about upstairs remodel, calling for inspections
|