Final | 4/24/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Final ok
|
Final | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey 210.8- Christmas GFCI device shall be located in a reakily accessible location. Below 6'7". 408,4- Circuit directory shall be completed at metermain on garage.
|
Rough-In Permanent Service | 1/12/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey corrections fixed rough-i ok cover p/s o/h n ok
|
Rough-In Permanent Service | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey 300.4- Furnace where NM cable passes through metal hole it shall be protcted from physical damage by bushing/connector. 300.4(G)- Raceway or connectors containing #4 or larger conductors shall have bushing installed to protect wiring. 314.17(C)- NM cable sheathing shall enter box minimum of 1/4". Ding room. 334.30- NM cable shall not be scured on edge. 250.134- Metal box in net panel shall be connnected to equipment grounding conductor.
|
Rough-In Permanent Service | 1/11/2016 | 1/11/2016 | 1/11/2016 | A | NR |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey see comments for ELE16-00043, 2005 N Liberty
|