Permit Information
Permit NumberELE16-00089
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 195 S CAPITOL BLVD
Project Name 
Customer Number3601
ePlanReviewNo
Description
New: Full Electrical Installation, including fixtures, receptacles, panels, fire alarm, and security.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/9/201611/9/201611/9/2016PPASS
DetailsRock A. Hudson
Inspect lighting in delivery area. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Correction complete, signed pages of level 5 temp office for GBAD permit. Final ok
Final11/8/201611/8/201611/8/2016PFAIL
DetailsRock A. Hudson
Call Pierce for inspection of kitchen. Phone #: ###-#### Inspection requested via web by Rafael Castillo
110.26(D)- At least 1 luminaire shall be installed about electrical equipment that is controlled by wall switch in shipping and receiving room off alley.
Electrical Rough-In10/31/201611/1/201611/1/2016APASS
DetailsRock A. Hudson
Call Pierce for walk through of kitchen and Districts TI for final. Phone #: ###-#### Inspection requested via web by Rafael Castillo
District bldg temp final ok.
Still to complete GFCI protect KL1 34 receptacle located in kitchen area, label panel KL1, complete hood wiring, complete shipping and receiving room off alley.
Electrical Rough-In10/27/201610/28/201610/28/2016APASS
DetailsRock A. Hudson
Call Cody for inspection of ceiling grid in kitchen. Late morning preferred. Phone #: ###-#### requested via web by Rafael Castillo
Area noted rough in ok cover
Electrical Rough-In10/27/201610/27/201610/27/2016PFAIL
DetailsRock A. Hudson
Call Pierce for kitchen ceiling inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo
300.11- Luminaires shall be supported independant of grid. Few fixtures missed and others with support wires at steep angles providing no support.
300.15- couple open boxes, 1 near hood still being worked on, 2nd above janitors closet door.
Electrical Rough-In10/15/201610/17/201610/17/2016APASS
DetailsRock A. Hudson
Call Pierce for inspection of heat trace in US bank building. Discuss ownership of heat trace on 3rd floor Parkin garage. Discuss readiness of final for CO of Districts. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Rough in of heat trace in US Bank building ok. Lea stated they will take responsibility for all orange heat trace installed by others.
For final inspection all core and shell permits shall pass and 1/2' openings used for luminaire support shall be closed as per NEC 314.17
Conference9/20/20169/21/20169/21/2016ADONE
DetailsRock A. Hudson
Call Rafael to sign TCO sheets in ESI office. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Signed all TCO sheets for TI portion.
Electrical Rough-In9/20/20169/20/20169/20/2016PPASS
DetailsRock A. Hudson
Call Rafael for TCO inspection of the 2nd floor area "C". Phone #: ###-#### Inspection requested via web by Rafael Castillo
TCO level 2 district building ok
Electrical Rough-In9/19/20169/19/20169/19/2016APASS
DetailsRock A. Hudson
Call Rafael for inspection of 5th floor corrections and 1st floor lobby finish lighting. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Corrections complete ok occupy 5th and 1st elevator lobby.
Electrical Rough-In9/15/20169/16/20169/16/2016PPASS
DetailsEric Story
. Call Rafael for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo

2nd floor area grid as noted on print
Final9/16/20169/16/20169/16/2016PPART
DetailsEric Story
TCO inspection for 4th and 5th floor of GBAD buidling TI portion. Call Rafael for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo

4th floor only ok to occupy...5th floor fail for 2 outlets and bonding of cable tray
Electrical Rough-In9/14/20169/15/20169/15/2016APASS
DetailsRock A. Hudson
Look over grid fixture on 2nd floor that were moved by grid installers. Phone #: ###-#### Inspection requested via web by Rafael Castillo
2nd floor elevator lobby grid reinspect rough in ok cover
Electrical Rough-In9/14/20169/14/20169/14/2016PPASS
DetailsRock A. Hudson
Call Rafael for inspection of 2nd floor grid area south of elevators. Phone #: ###-#### Inspection requested via web by Rafael Castillo

section as noted on print...rough in grid...ok to cover....prefunction grid reinspect for earthquake clips lights been moved
Electrical Rough-In9/14/20169/14/20169/14/2016ACANC
DetailsRock A. Hudson
Call Rafael for inspection of 2nd floor grid south area. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo
Electrical Rough-In9/13/20169/13/20169/13/2016PPASS
DetailsRock A. Hudson
Call Cody for inspection of 1st and 2nd floor grid ceiling in lobby area. Phone #: ###-#### Inspection requested via web by Rafael Castillo

1st and 2nd elevator lobby grid and hardlid rough in ok cover
Electrical Rough-In9/13/20169/13/20169/13/2016APASS
DetailsRock A. Hudson
Call Rafael for inspection 1st floor hard lid. Phone #: ###-#### Inspection requested via web by Rafael Castillo

1st floor hardlid and 2nd floor lobby grid as noted on print rough in ok cover
Electrical Rough-In9/12/20169/12/20169/12/2016PPASS
DetailsRock A. Hudson
Call Rafael for inspection of 4th floor lobby high grid ceiling area. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Area as noted grid rough in ok cover
Electrical Rough-In9/9/20169/9/20169/9/2016PPASS
DetailsRock A. Hudson
Call Bob for rough in inspection of 2nd floor soffit and walls and kitchen outlets behind equipment. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Kitchen GFCI devices readily accessible ok if kitchen equipment on wheels.
2nd level bridge wall receptacle wall, soffit cans elevator lobby rough in ok cover
Electrical Rough-In9/8/20169/8/20169/8/2016APASS
DetailsRock A. Hudson
Call Bob for inspection of 2nd floor soffits. Phone #: ###-#### Inspection requested via web by Rafael Castillo
District kitchen transformer, Generator on floor 3 parking garage grounding corrected, and level 2 stair 5 lobby soffit cans rough in ok cover
Electrical Rough-In9/7/20169/7/20169/7/2016PPART
DetailsRock A. Hudson
Call Bob for inspection of walls on 2nd and 4th floor near elevators. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Double checked generator and transfer swith, seperation of grounds and neutral at generator required.

2nd floor not ready 4th floor column in ballroom lobby rough in ok cover
Final9/1/20169/1/20169/1/2016PPART
DetailsEric Story
4th floor temp occ ok
Electrical Rough-In9/1/20169/1/20169/1/2016PPASS
DetailsEric Story
Call Rafael for inspection of 4th floor Clearwater. Phone #: ###-#### Inspection requested via web by Rafael Castillo
GBAD level 3 transformer ok to energize, lobby ceiling ok cover other the area with core and shell permit wiring, it is marked on print.
Electrical Rough-In8/31/20169/1/20169/1/2016ANR
DetailsEric Story
Call Rafael for TCO final of only the 4th floor in the Clearwater side of building. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Will need blank covers on all lv boxes and trim out outlet for drinking fountain, field identification for panels as well
Electrical Rough-In8/30/20168/31/20168/31/2016PPASS
DetailsJames Ady
Call Bob for inspection of soffit above escalator on 2nd floor, 2nd floor wall r/i at escalator, and 4th floor pre-function grid ceiling inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo 4th floor prefunction Ceilinng ok, 2nd floor escalator and Storage room walls ok
Electrical Rough-In8/29/20168/29/20168/29/2016PPASS
DetailsRock A. Hudson
Call Bob for inspection of transformers on 5th floor mezzanine. Phone #: ###-#### Inspection requested via web by Rafael Castillo Area noted rough in ok cover
Electrical Rough-In8/29/20168/29/20168/29/2016PFAIL
DetailsRock A. Hudson
Call Bob for inspection of transformers on 5th floor mezzanine. Phone #: ###-#### Inspection requested via web by Rafael Castillo
BCC 4-05-23- Unlawful to conceal.
Prefunction room 453 4th floor grid installed prior to inspection. Remove tile in this area for inspection
Electrical Rough-In8/24/20168/25/20168/25/2016APASS
DetailsRock A. Hudson
Call Bob for inspection of ceiling grid areas in Clearwater building and structural documentation for chandelier on 4th floor above escalator. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas grid 413 except exit, 418, 419, 420, 421 and cloud hardlid rough in ok cover
Electrical Rough-In8/24/20168/24/20168/24/2016PPASS
DetailsRock A. Hudson
Call Bob for inspection of ballroom A grid ceiling, soffit above escalator on 4th floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Above escalator not ready. Hall 417, 422 grid and ballroom A 412 grid, speakers in A and B rough in ok cover
Electrical Rough-In8/22/20168/23/20168/23/2016PPASS
DetailsRock A. Hudson
Call Bob for inspection of ceiling grid in Clearwater building side and ballroom and for inspection of walls on 2nd floor near stair 5. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Hall grid 411, 425, meeting rooms 414, 415, 416 grid, ballroom B, C grid. Area B speakers not in place. Rough in ok cover
Electrical Rough-In8/22/20168/23/20168/22/2016PCANC
DetailsRock A. Hudson
Call Bob for inspection of ceiling grid in ballroom C. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo
Electrical Rough-In8/19/20168/19/20168/19/2016PPASS
DetailsRock A. Hudson
Call Rafael for inspection of walls on 2nd floor around stair 5 and heat trace near commercial kitchen. Phone #: ###-#### Inspection requested via web by Rafael Castillo
On heat trace contractor to provide instructions and listing and EPD protection. Walls near stair 5 as noted on contractor print rough in ok cover
Electrical Rough-In8/18/20168/18/20168/18/2016PPASS
DetailsRock A. Hudson
Call Bob for inspection of walls at 4th floor pre-function/ballroom doorways. Inspection of ceiling grid in meeting rooms 410 and 424. Phone #: ###-#### Inspection requested via web by Rafael Castillo areas noted pluse south wall and ballroom as noted on print. ok to cover
Electrical Rough-In8/17/20168/17/20168/17/2016APASS
DetailsRock A. Hudson
Rough-in inspection of walls on 4th and 5th floor around stairwell 5. Call Bob for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo areas as noted plus elevator walls. Fixture on drop cloud ceiling shall have access to splice points and shall provide proof ceiling system is rated for weight.
Electrical Rough-In8/16/20168/16/20168/16/2016PPASS
DetailsRock A. Hudson
Bob ###-#### Soffit area 450 and grid roughin in 410 meeting rm grid roughin ok to cover.
Electrical Rough-In8/16/20168/16/20168/16/2016APASS
DetailsRock A. Hudson
Call Bob for inspection if vestibule wall along stairwell 3 and soffits around lobby 450. Phone #: ###-#### Inspection requested via web by Rafael Castillo
vestibule lid only rough in ok cover
Electrical Rough-In8/15/20168/15/20168/15/2016PNR
DetailsRock A. Hudson
Call Bob for ceiling inspection of grid area on 4th floor, meeting room 410. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Electrical ok Need to support speakers will recall
Electrical Rough-In8/11/20168/11/20168/11/2016APASS
DetailsRock A. Hudson
Call Bob for rough in inspection of hard lids in kitchen bathroom and ballroom wall near elevator shaft. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Back wall to elevator shaft level 4, kitchen bathroom hardlids, areas noted rough in ok cover
Electrical Rough-In8/9/20168/9/20168/9/2016PPASS
DetailsRock A. Hudson
R/I inspection of walls, different areas. Call Bob for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Ballroom pocket walls, prefunction door walls, prefunction soffits and droplids as noted on prints rough in ok cover
Conference8/1/20168/2/20168/2/2016ADONE
DetailsRock A. Hudson
Call Rafael to discuss outlets in ceiling area of ballroom. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Discussed location of receptacle outlets above a "grid cloud". Flexible cords are not to be installed above grid in any application as per NEC 400.8 uses not permitted. Receptacle outlets shown for temporary equipment for events shall be mounted in or below grid level.
Electrical Rough-In7/25/20167/25/20167/25/2016PPASS
DetailsRock A. Hudson
R/I inspection of unisex bathroom and wall on south side of area C. Call Bob for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Bath noted 4th floor rough in ok cover
Electrical Rough-In7/13/20167/13/20167/13/2016APASS
DetailsRock A. Hudson
Call Bob for r/i inspection of walls on 4th floor level area C and D, partial only. Phone #: ###-#### Inspection requested via web by Rafael Castillo
4th floor bath and stair 3 wall as marked in book rough in ok cover
Electrical Rough-In6/16/20166/17/20166/17/2016APASS
DetailsRock A. Hudson
Call Bob for R/I inspection of north wall on 4th floor in ballroom area. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Prefunction room 453 west wall rough in ok cover
Electrical Rough-In6/13/20166/14/20166/14/2016PPASS
DetailsRock A. Hudson
Call Bob for inspection of 5th floor IT room exterior wall. Phone #: ###-#### Inspection requested via web by Rafael Castillo
As noted and marked on print wall rough in ok cover
Electrical Rough-In6/2/20166/3/20166/3/2016APASS
DetailsRock A. Hudson
Call Rafael for R/I inspection of walls on the east end of building 4th and 5th floors of the 5 story building. Phone #: ###-#### Inspection requested via web by Rafael Castillo
4th and 5th floor walls rough in ok cover Marked on contractor and book in dark green.
Conference5/24/20165/24/20165/24/2016ADONE
DetailsRock A. Hudson
Look at location of AC unit for clearance and acceptance of placement. Call Bob to discuss. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Discussed AC unit 4th floor ceiling area 450, unit 4.25. Placed between 2 beams with 18" clearance with no intrusion of other trades. Install ok
Electrical Rough-In5/18/20165/19/20165/19/2016APASS
DetailsRock A. Hudson
Walk through to review project progress. R/I inspection of bathrooms on south end of 4th floor area C. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Area noted baths wall rough only ok cover
Conference5/16/20165/16/20165/16/2016PCANC
DetailsRock A. Hudson
Discuss clearances on 5th floor mezzanine and variances that my be allowed. Call Bob. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo
Electrical Rough-In4/27/20164/27/20164/27/2016PPASS
DetailsRex Boyles
Wall inspections in kitchen, 4th, and 5th floor ballroom areas. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok see e sheets
Conference4/15/20164/18/20164/18/2016ADONE
DetailsRex Boyles
Look at option of installing plywood to 5th floor mezzanine wall up only 4'' AFF. Looking to see if this would cause any issues for damage to electrical installation by Boise City electrical inspector. Call Rafael at ###-####. Phone #: ###-#### Inspection requested via web by Rafael Castillo discuss mc cable in wall only being sheeted up to 48". mc cable looks ok at just under 48" installed horizontilly in wall. If subject to physical dammage,install stud to protect
Electrical Rough-In4/12/20164/13/20164/13/2016APASS
DetailsRex Boyles
Contact Bob for inspection of interior and exterior walls on the 4th floor area A/B and walls on 4th and 5th floor area D. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i walls in these areas ok
Electrical Rough-In4/7/20164/8/20164/8/2016APASS
DetailsRex Boyles
Contact Bob for partial inspection of exterior and interior walls on 4th floor area A/B. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok 4th floor east half walls and soffits, north interior walls also see pink highlighted areas on plans
Electrical Rough-In3/16/20163/16/20163/16/2016PPASS
DetailsRex Boyles
Contact Bob for inspection of walls on 4th floor around modern folding door system closet. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok 2 curtain walls see highlighted areas on plans
Conference3/10/20163/14/20163/14/2016PDONE
DetailsRex Boyles
Continue discussion of installation methods in parking garage area on 3rd floor with Rex. Phone #: ###-#### Inspection requested via web by Rafael Castillo Discuss "GBAD" parking structure conduit installation. All electrical conduit, enclosures, boxes and fixtures within 10 foot of outside edge of building shall have be listed raintite and be raintite application.
Conference3/8/20163/10/20163/10/2016ADONE
DetailsDaryl DeGrange
Discuss installation methods to be used in parking garage area on 3rd floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo rescheduled for monday 3/14/16
Conference1/14/20161/14/20161/15/2016PDONE
DetailsRex Boyles
Discuss NEMA rating requirements for generator room area on 3rd floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo nema 3R rated or raintite electrical equipment, conduit,fittings and boxes shall be installed in generator area, since generator enclosure is in open parking garage structure and subject to possible exposure to water.