Final | 1/12/2016 | 1/13/2016 | 1/13/2016 | A | PASS |
Eric Story
|
|
|
Install and wire a new 120 volt 20 amp dedicated circuit #20 from "Mech." Panel to a new duplex for the future communications board on the opposite side of the wall from the panel. Ask for Justin. If you have questions please call Jeremiah at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell final ok
|
Electrical Rough-In | 1/12/2016 | 1/13/2016 | 1/13/2016 | A | PASS |
Eric Story
|
|
|
Install and wire a new 120 volt 20 amp dedicated circuit #20 from "Mech." Panel to a new duplex for the future communications board on the opposite side of the wall from the panel. Ask for Justin. If you have questions please call Jeremiah at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell rough-in ok
|