Final | 4/11/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Rock A. Hudson
|
|
|
Please call when headed my way, thanks Richard ###-#### Phone #: ###-#### Inspection requested via web by Richard Corn Final ok
|
Electrical Rough-In | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Rock A. Hudson
|
|
|
Kitchen cover inspection, please call when headed my way, I''ll be waiting. Thanks. Richard ###-#### Phone #: ###-#### Inspection requested via web by Richard Corn corrections complete. kitchen remodel rough in ok cover
|
Electrical Rough-In | 3/15/2016 | 3/16/2016 | 3/16/2016 | P | FAIL |
Eric Story
|
|
|
Kitchen cover, please call when headed my way. ###-####. Thanks Richard
Phone #: ###-#### Inspection requested via web by Richard Corn wire nut for range splice not rated for copper@all. 334 type NM cable shall not be installed where subject to physical damage(wire ran behind drawers behind shelf for pensila outlet) walls ok cover
|
Electrical Rough-In | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | PASS |
Rock A. Hudson
|
|
|
I should be there by 8:45 to let you in. Please call when headed my way. I will be waiting. ###-#### thanks Richard Phone #: ###-#### Inspection requested via web by Richard Corn Phase 1 is master bathroom. At this time main bath and kitchen areas not to change much. These areas may just be updating lights and receptacles at current locations. Contractor to request inspections if extending or adding circuits in future. Master bath phase1 rough in ok cover
|