Final | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Mark Moncarr
|
|
|
Tom Phone #: ###-#### Ok final. Elevator lobby lights on floors 2-5 are temporary fixtures untill perm fixtures come in. Rooms 209, 409, 333, 433, and 533 also have temp fixtures in place while waiting on permanent fixtures.
|
Final | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | NR |
Mark Moncarr
|
|
|
Tom Phone #: ###-####
|
Final | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PART |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### TCO approved for construction/maintenance personnel only, no guests or hotel workers. A few locations lights are still needing to be installed, but locations are safed off.
|
Final | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | PART |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### The rest of the 1st floor except kitch 1, kitch 2, lobby area and pool. Access to construction/maintenance personnel only. No hotel employees or guests.
|
Final | 4/18/2017 | 4/18/2017 | 4/18/2017 | P | PART |
Mark Moncarr
|
|
|
Jake 1st floor Phone #: ###-#### 1st floor guest rooms and meeting rooms only. Maintanance personnel and construction personnel only. No hotel employees.
|
Final | 4/11/2017 | 4/11/2017 | 4/12/2017 | P | PART |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Partial final. Access only to contruction and maintenance personnel. Rooms needing light install are 209, 309, 409, 509, 333, 433, and 533. Locations are safed off for now.
|
Final | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PART |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Partial for contractors and maintenance personnel only, no hotel employees. Talked to Jake, there are a couple of lights still needing hung, but are safed off.
|
Final | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PART |
Mark Moncarr
|
|
|
Partial for 4th level, possibly 3 - Jake Phone #: ###-#### 4th floor rooms 401-442 partial. Maintenance and construction personnel only
|
Final | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PART |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Rooms 501-542 5th floor partial final. For maintenance and contruction personnel only, no housekeeping or hotel employees. Hotel is still considered construction site.
|
Permanent Service | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | FAIL |
Rock A. Hudson
|
|
|
ceiling grid; Jake Phone #: ###-#### Inspection for meyers cabinet on west side for sidewalk and street lighting must have seperate permit. Seperate service drop not part of building requires seperate permit.
|
Electrical Rough-In | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Rock A. Hudson
|
|
|
ceiling grid; Jake Phone #: ###-#### 1st floor corridor east grid and 2nd floor corridor grid rough in ok cover
|
Electrical Rough-In | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 3rd floor corridor, and 4th/5th floor ceiling in house keeping roooms
|
Electrical Rough-In | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Mark Moncarr
|
|
|
Ceiling - Jake Phone #: ###-#### 4th floor grid in hallways ok cover
|
Electrical Rough-In | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Mark Moncarr
|
|
|
Tom or call Jake-ceiling Phone #: ###-#### Ok cover 1st floor laundry ceiling
|
Electrical Rough-In | 3/20/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Cover for meeting rooms, cafe, and lobby
|
Electrical Rough-In | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Mark Moncarr
|
|
|
ceiling grid; Tom Phone #: ###-#### Ceiling ok cover for 1st floor vestibule, guest kitchen and fitness room
|
Electrical Rough-In | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Eric Story
|
|
|
ceiling grid; Jake Phone #: ###-#### Lobby area suspended ceilings and 5th floor corridor minus 3 areas were ames needed to be installed
|
Conference | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | DONE |
Eric Story
|
|
|
ceiling grid; Jake Phone #: ###-#### Discussed as per 406-12 stating all receptacles shall be tamper resistant type will need to replace all receptacles
|
Electrical Rough-In | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake/ceiling cover for 1st floor Phone #: ###-#### Ok cover 1st floor ceiling in kitchen area, and 1st floor 2 managers offices.
|
Electrical Rough-In | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 2nd & 3rd floor elevator lobbies ok cover
|
Electrical Rough-In | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Lobby 1st floor west side, meeting rm 1 1st floor south side and 1st floor eastside rooms for dropped ceilings and conduit.
|
Electrical Rough-In | 1/27/2017 | 1/27/2017 | 1/27/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Area 4 cans and 2 vestibule heaters with disc. 2 pool bathrooms
|
Electrical Rough-In | 1/26/2017 | 1/26/2017 | 1/26/2017 | P | PASS |
Mark Moncarr
|
|
|
jake Phone #: ###-#### Ok cover. Mens and Womens bathroom 1st floor south side. 1st floor south side meeting room hard lid
|
Electrical Rough-In | 1/25/2017 | 1/25/2017 | 1/25/2017 | P | PASS |
Mark Moncarr
|
|
|
jake Phone #: ###-#### ok cover. Area 3 soffits in bar and dining.
|
Electrical Rough-In | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Ground level Area 2 ceiling cover, and employee bathroom
|
Electrical Rough-In | 1/19/2017 | 1/19/2017 | 1/19/2017 | P | PASS |
Mark Moncarr
|
|
|
jack Phone #: ###-#### 2nd floor corridor soffits ok cover
|
Electrical Rough-In | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 5th floor 8 cans in soffit in front of elevators Ok to cover
|
Electrical Rough-In | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 3rd floor corridor cans ok cover
|
Electrical Rough-In | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 4th floor corridor soffits ok cover
|
Electrical Rough-In | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### All 3rd floor room soffits. Ok cover
|
Electrical Rough-In | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Remainder of 1st floor lobby, and 1st floor sprinkler room S. side.
|
Electrical Rough-In | 12/20/2016 | 12/21/2016 | 12/21/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 1st floor laundry walls. 3rd floor-all bath soffits. ok cover
|
Electrical Rough-In | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | PASS |
Mark Moncarr
|
|
|
ceiling, hallway soffits, 5th floor - Tom Phone #: ###-#### Hallway soffits 5th floor ok cover
|
Electrical Rough-In | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### ok cover Area 7,8 and 4 baths area 9- 1st floor
|
Electrical Rough-In | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
Rock A. Hudson
|
|
|
Jake Phone #: ###-#### Discussed wiring being damaged by unlicensed laborers. Damage occurs with out electrical contractor being notified creating patches in firewalls and ceilings. Will try to catch individuals next week when working on 3rd floor. 1st floor corridors and offices noted on print and 4th floor drop ceilings rough in ok cover
|
Permanent Service | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
Rock A. Hudson
|
|
|
Jake Phone #: ###-#### Contractor doing work over weekend. Will call for inspection Monday to check work. Placed service sticker in old disconnect. Changing from 100amp to 200amp. New 200amp disconnect will be on interior back to back. p/s o/h rec ok
|
Electrical Rough-In | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### 2 light poles bases west side off 10th ok cover
|
Electrical Rough-In | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Area 2&3 ground floor west side
|
Electrical Rough-In | 12/1/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Mark Moncarr
|
|
|
Pole base - Jake Phone #: ###-#### 4 light pole cages south side.
|
Electrical Rough-In | 11/22/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### ok cover AREA1 first fl.
|
Electrical Rough-In | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### Lt pole on W side, and rest of 5th floor ceilings
|
Electrical Rough-In | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake//ceiling soffits Phone #: ###-#### ok cover rm 501-521 except 519. 4th floor rm 409, 413, 415.
|
Electrical Rough-In | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### ok cover 2nd floor rms
|
Electrical Rough-In | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake would like the inspection as late as possible. Phone #: ###-#### West side of 4th floor outlets placement as per Daryl DeGrange rough ok cover. All of 3rd floor outlet placement as per Daryl DeGrange rough ok cover
|
Electrical Rough-In | 9/28/2016 | 9/28/2016 | 9/28/2016 | P | PASS |
Rock A. Hudson
|
|
|
Jake would like AM if possible Phone #: ###-#### Level 4 unit 425 to east receptacle additions rough in ok cover
|
Electrical Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
James Ady
|
|
|
Jake Phone #: ###-#### n 5th floor added receps ok to cover
|
Electrical Rough-In | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### checked jumper from pool to hottub for 1 whole equipotential plane
|
Conference | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | DONE |
James Ady
|
|
|
Jake Phone #: ###-#### Discussed wall space layout for recepticles as well as bathroom recep requirements
|
Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 | P | FAIL |
James Ady
|
|
|
Jake Phone #: ###-#### 210.60 Guest rooms suites and similar occupantcies shall comply with 210.52 A and D. 210 52 A 1 receps shall be installed so that no space along floor is more than 6 feet fromm a receptacle
|
Permanent Service | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Mark Moncarr
|
|
|
Jake Phone #: ###-#### correction made.
|
Permanent Service | 9/1/2016 | 9/1/2016 | 9/1/2016 | P | FAIL |
James Ady
|
|
|
Jake Phone #: ###-#### 110.24 A availabel fault current shall be feild marked
|
Electrical Rough-In | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Mark Moncarr
|
|
|
Tom Phone #: ###-#### S. wall cover for house keeping rooms levels 1-5 rough in ok
|
Electrical Rough-In | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
James Ady
|
|
|
jake Phone #: ###-#### 5th floor ok to cover
|
Electrical Rough-In | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Eric Story
|
|
|
Jake Phone #: ###-#### 3rd and 4th corrridor walls and cieling only ok cover. Discussed with GC that all water lines and equipment within 6' above panels shall not be there and will remove what is in the dedicated area.
|
Electrical Rough-In | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Eric Story
|
|
|
Jake Phone #: ###-#### first floor north electrical room(only one receptalce and data on north wall was all there was to look at )ok cover
|
Conference | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | DONE |
Eric Story
|
|
|
jake Phone #: ###-#### discussed repairing or completely replacing conduit that was hit. conduit was installed in 1930 therefor find a listed part maybe hard to come by. most likely will be refeeding all of what it was powering up.
|
Electrical Rough-In | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Eric Story
|
|
|
Jake underground only Phone #: ###-#### west end underground ok cover
|
Electrical Rough-In | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | PASS |
Eric Story
|
|
|
underground; Jake Phone #: ###-#### underground for primary feeders ok cover
|
Electrical Rough-In | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Eric Story
|
|
|
Jake//underground Phone #: ###-#### east side first floor underground ok cover
|
Electrical Rough-In | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | CANC |
Eric Story
|
|
|
underground Phone #: ###-#### not ready at this time will call back for 3/15/16
|
Electrical Rough-In | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | NR |
Daryl DeGrange
|
|
|
Jake Phone #: ###-#### Contractor called, wants to reschedule for monday 3/14/16
|