ELE-Aging Inspection | 3/9/2020 | 3/9/2020 | 3/9/2020 | | PASS |
Daryl DeGrange
|
|
|
See final
|
Final | 3/9/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Daryl DeGrange
|
|
|
Power connection for A/C unit, job complete, Final ok
|
ELE-Aging Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | | DONE |
Mark Moncarr
|
|
|
4th attempt. List was sent to contractor of afing inspections that need to be taken care of. Please coordinate and schedule a final inspection.
|
ELE-Aging Inspection | 9/9/2019 | 9/9/2019 | 9/13/2019 | | DONE |
Mark Moncarr
|
|
|
Schedule a final inspection.
|
ELE-Aging Inspection | 6/10/2019 | 6/10/2019 | 6/11/2019 | | DONE |
Mark Moncarr
|
|
|
Please coordinate and schedule a final inspection.
|
ELE-Aging Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | | DONE |
Daryl DeGrange
|
|
|
Made contact with contractor verbally by phone and sent Email to contractor with list of permits that require inspections
|