Final | 3/21/2016 | 3/22/2016 | 3/22/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer Final ok
|
Final | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Ron Phone #: ###-#### Address issue is being worked on. 210.8- GFCI receptacle for drinking fountain shall be in a readily accessible location not inside drinking fountain housing.
|
Permanent Service | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | PASS |
Bob Reichert
|
|
|
reference BLD16-00472. for services on units 150A and 150C plusm the permit is for work done on units 130, 140, 150A, 150B, and 150C Phone #: ###-#### Inspection requested via web by ron spen cer corrections made, p/s, exst meter pak, n, ok, 2 meters required
|
Permanent Service | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | FAIL |
Rock A. Hudson
|
|
|
This permit covers remodel and tenant improvements for suites 130, 140, 150A, 150B, 150C. refer to building permit #BLD16-00472. This 1st inspection is for power to panel on 150A and 150C. Phone #: ###-#### Inspection requested via web by ron spen cer Unable to do inspection due to building permit is still under review. Also BLD permit noted is for space 110 and ELE is for space 140. Recall when BLD has been issues and address issue corrected. Posted correction and had verbal with individuals on sight.
|