Final | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn corrections made, ok final
|
Final | 5/26/2016 | 5/26/2016 | 5/26/2016 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn 110.3- Device shall be wired as per instructions. Miswire laundry GFCI, will not set and others not working. 210.52(D)- Bathroom receptacle location shall be on wall or prtition ajacent to basin or basin counter top. Jack and Jill bathroom receptacle located in cabinet.1 shall be installed on side of cabinet or wall. 324.20- Box mounted in wall with wood covering shall be flush or have extension ring installed in master bath cabinet.
|
Electrical Rough-In | 4/18/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Bob Reichert
|
|
|
floor heat in master bath Phone #: ###-#### Inspection requested via web by Darryn Coburn ok cover floor heat only
|
Rough-In Permanent Service | 2/24/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn ri ok, p/s u/g n ok
|