Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberELE16-00580
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 505 W BROAD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Underground and electrical installation for Podium. ***4-4-16 as per customer value has increased /CEV***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/28/20182/28/20182/28/2018PPASS
DetailsRock A. Hudson
All complete, signed off in office. Final ok
Final2/26/20182/27/20182/27/2018APART
DetailsRock A. Hudson
2nd level Mezzanine heat tape final
Contact Bob Mott
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
210.63- Service receptacle required east garage with in 25' of mini split.
Mezz heat tape, work clearance for panels located in 217 OK
Final2/26/20182/26/20182/26/2018PPART
DetailsRock A. Hudson
Roof strapping complete, Check heat tape EPD and service receptacle for mini splits garage. Work clearences 217.
Final2/1/20182/2/20182/2/2018APART
DetailsRock A. Hudson
Level 3 Rooms 301-322 (no Rm #303 and #321 community room not ready)
Contact Bob Mott
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Notes listed are covered by ELE16-03931. Signed TCO for rest of parking garage. Island will be removed or relocated due to tight rurn radius entering garage.
Final1/30/20181/31/20181/31/2018APART
DetailsRock A. Hudson
Final on Trash recycle 112, mezzanine M06, Mechanical M07, utility 212, storage 214, electrical 217 Phone #: ###-#### Inspection requested via web by Cathy Duchek
Complete labels for HVAC units o mezz. Areas noted signed off in office. TCO ok
Conference1/31/20181/31/20181/31/2018PDONE
DetailsRock A. Hudson
Completion list to 1-31-18-
ELE16-00580 Podium permit-
112A trash/ recycle, 113 water/fire, 114 bike parking, 115 generator room, 214 storage, 217 electrical, M06, M07, heat trace, perimeter egress ok, liveworks units are painting stage,
Pay island is going to be removed and relocated, wiring to be removed. Wiring exposed as of 1-31-18. Informed wiring shall be removed to maintain TCO.
Final1/11/20181/12/20181/12/2018APART
DetailsRock A. Hudson
space 113 fire riser room, 114 bike parking, 115 generator Phone #: ###-#### Inspection requested via web by Cathy Duchek
Rooms noted siged off in office. Temp final ok
Permanent Service1/4/20181/4/20181/4/2018APASS
DetailsDaryl DeGrange
Street lighting control cabinet, p/s u/g n ok
Final12/20/201712/20/201712/20/2017PPART
DetailsDaryl DeGrange
Temporary occupancy of the first 1 1/2 floors of garage Phone #: ###-#### Inspection requested via web by Cathy Duchek Phase one TCO Parking Garage, Partial Final ok
Electrical Rough-In8/15/20178/15/20178/15/2017PPASS
DetailsRock A. Hudson
walls- 115 generator, 113 water-fire, 114 bikeparking, 214 storage, electrical 217 Phone #: ###-#### Inspection requested via web by Cathy Duchek
Rooms noted walls only rough in ok cover
Electrical Rough-In7/24/20177/24/20177/24/2017PPASS
DetailsRock A. Hudson
mci feeders in garage going in shaft wall Phone #: ###-#### Inspection requested via web by Cathy Duchek
Vertical shafts in garage for feeders rough in ok cover
Electrical Rough-In5/9/20175/10/20175/10/2017PPASS
DetailsRock A. Hudson
rough-in walls in mezzanine M06 Phone #: ###-#### Inspection requested via web by Cathy Duchek Wall rough in ok cover
Electrical Rough-In4/10/20174/10/20174/10/2017APASS
DetailsRock A. Hudson
Ceiling inspection in garage area level 1 ; 2. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum
Area noted 1,2 garage ceilings and heat trace. Rough in ok to insulate.
Electrical Rough-In4/10/20174/10/20174/10/2017PFAIL
DetailsRock A. Hudson
Ceiling inspection in garage area level 1 ; 2. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum
Level 2 electrical room 212, brace for duct work in work space minimum for panels in room.
110.26- Minimum clear work space for voltage present is 30" wide, 36" deep, from floor to height of 6 1/2'.
Heat trace covered by this permit is roof and main water and drains. Fire sprinkler pipes heat trace installation said to be done by others, permit and licensing required.
Permanent Service10/6/201610/10/201610/10/2016APASS
DetailsEric Story
Available Arc Flash Current Report in hand.
The Fowler
Contact Lonny Baum
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
p/s u/g n ok
Permanent Service10/5/201610/6/201610/6/2016AFAIL
DetailsEric Story
The Fowler
Contact Lonny Baum
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Avaliable fault current needed
Main bonding jumper shall be upsized as per 250.66
Electrical Rough-In5/4/20165/5/20165/5/2016APASS
DetailsRex Boyles
1st floor and Mez conduit rough-in PT slab. Call Lonny with any questions. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum r/i ok 1st floor and mezz slab on deck conduits and boxes for garage lights. Also u. ground conduits to generator, fire pump and live/work conduits running north on east side of bldg. See Lonny's A sheets highlighted
Rough-In Permanent Service3/9/20163/9/20163/9/2016PCANC
DetailsRex Boyles
UFER inspection for permanent service and fire pump service. Call Lonny for any questions. Thanks Phone #: ###-#### Inspection requested via web by Lonny Baum just needed r/i
Electrical Rough-In3/9/20163/9/20163/9/2016PPASS
DetailsRex Boyles
UFER inspection for permanent service and fire pump service. Call Lonny for any questions. Thanks Phone #: ###-#### Inspection requested via web by Lonny Baum r/i ok concrete encased electrode for MSBs and fire pump controller
Electrical Rough-In3/2/20163/3/20163/3/2016PPASS
DetailsRex Boyles
Under ground inspection on main feeder conduits at garage level. Call Lonny with any questions, thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum r/i ok partial secondaries on north half. Also discuss fire pump again. Waiting for Idaho POwer to ok CT meter mounted directly to ransformer OR ct enclosure mounted inside fire pump room??
Conference3/1/20163/1/20163/1/2016PDONE
DetailsRex Boyles
Need to review options for fire pump. Thanks, Lonny Phone #: ###-#### Inspection requested via web by Lonny Baum discuss NEC article 695 on fire pump installation. Also ask Tom th super to get inspections prior to cover ex:1 siding drywall . Lonny will get back to us on his plan for fire pump
Conference2/27/20162/29/20162/29/2016ADONE
DetailsDaryl DeGrange
Would like a conference to go over site specifics of job inspections. Thanks, Lonny Phone #: ###-#### Inspection requested via web by Lonny Baum Discussed service conductors inside and outside building structure for uitlity and fire pump power.