Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE16-00662
StatusFinaled
Name POWER PLUS INC
Site Address 481 W GOWEN RD
Project Name 
Customer Number1406MainBl
ePlanReviewNo
Description
Alteration: site elec., site lighting, cable trays, ducts & raceways, panel boards.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/16/20173/17/20173/17/2017APASS
DetailsJames Ady
Final final, all that is remaining is the fuel island and automatic gate. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
Final2/2/20172/3/20172/3/2017APART
DetailsJames Ady
Paint booth final. Phone #: ###-#### Inspection requested via web by Debby Pierce Check equipment hook ups at time of fuel island final. Spray booth final only ok
Electrical Rough-In1/12/20171/13/20171/13/2017APASS
DetailsJames Ady
Fuel island underground cover. Phone #: ###-#### Inspection requested via web by Debby Pierce underground only ok to cover
Conference12/22/201612/27/201612/27/2016ADONE
DetailsJames Ady
Conference request for fuel island. Phone #: ###-#### Inspection requested via web by Debby Pierce Talked about seal off location inside pole light. Needs to be at hand hole in pole
Final12/15/201612/16/201612/16/2016APART
DetailsJames Ady
Remainder of building drive thru wash bay. Phone #: ###-#### Inspection requested via web by Debby Pierce Drive thru wash final ok
Final12/14/201612/15/201612/15/2016APART
DetailsJames Ady
Remainder of building and exterior with the exception of the drive thru wash bay. Phone #: ###-#### Inspection requested via web by Debby Pierce No washbay, Need GFCI on E Drop cord of Grounds shop,Partial Final ok
Final12/12/201612/13/201612/13/2016APART
DetailsJames Ady
Partial final, north office area, warehouse and site/exterior of building. Phone #: ###-#### Inspection requested via web by Debby Pierce Partial final North office and Wearhouse only Final ok
Final11/29/201611/29/201611/29/2016ANR
DetailsJames Ady
Ceiling cover, all remaining grid south of administration area. Phone #: ###-#### Inspection requested via web by Debby Pierce Needed rough in Not final
Electrical Rough-In11/29/201611/29/201611/29/2016PPASS
DetailsJames Ady
Ceiling cover, all remaining grid south of administration area. Phone #: ###-#### Inspection requested via web by Debby Pierce Ceiling only ok to cover
Electrical Rough-In11/8/201611/9/201611/9/2016APASS
DetailsJames Ady
Ceiling cover for administration office area north of grid line P. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
Permanent Service11/2/201611/3/201611/3/2016APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Debby Pierce p/s u/g n ok
Electrical Rough-In9/29/20169/29/20169/29/2016PPASS
DetailsJames Ady
Underground cover for PVC from building stub outs to future fuel island. Phone #: ###-#### Inspection requested via web by Debby Pierce underground ok to cover
Electrical Rough-In9/22/20169/23/20169/23/2016APASS
DetailsJames Ady
Wall rough in a at grid line 3.1 in grounds warehouse. Phone #: ###-#### Inspection requested via web by Debby Pierce Rough in ok to cover
Electrical Rough-In9/15/20169/15/20169/15/2016PPASS
DetailsJames Ady
Partial rough in on wall 3.1 between grid lines H and M. Phone #: ###-#### Inspection requested via web by Debby Pierce ok to cover
Electrical Rough-In9/8/20169/9/20169/9/2016APASS
DetailsDaryl DeGrange
Wall rough in under main mezzanine, book storage and restroom/showers. Phone #: ###-#### Inspection requested via web by Debby Pierce rough-in ok cover
Electrical Rough-In8/25/20168/26/20168/26/2016APASS
DetailsBob Reichert
Partial interior office wall cover inspection, also quick conference on classified location area. Phone #: ###-#### Inspection requested via web by Debby Pierce inner office area and perimeter walls ok cover, will do conference later
Electrical Rough-In8/11/20168/12/20168/12/2016APASS
DetailsBob Reichert
Partial wall rough in for north side of building administration area, south to grid line P. Phone #: ###-#### Inspection requested via web by Debby Pierce walls only, per contractor description for inspection request ok cover
Electrical Rough-In5/7/20165/9/20165/9/2016APASS
DetailsEric Story
Two floor boxes in north section of main building slab. Phone #: ###-#### Inspection requested via web by Debby Pierce 2 floor boxes and underground in the north end of structure ok cover
Electrical Rough-In4/18/20164/19/20164/19/2016APASS
DetailsBob Reichert
Under slab conduit cover. Phone #: ###-#### Inspection requested via web by Debby Pierce ok pour slab west part main building
Electrical Rough-In4/12/20164/13/20164/13/2016APASS
DetailsBob Reichert
Underground main bldg. Phone #: ###-#### Inspection requested via web by Debby Pierce ok cover u/g going n-s middle main building
Electrical Rough-In4/4/20164/5/20164/5/2016APASS
DetailsBob Reichert
Ufer ground for fire pump main switch in main building, concrete pours in at 10AM. Phone #: ###-#### Inspection requested via web by Debby Pierce ok pour concrete encased electrode
Electrical Rough-In3/31/20164/1/20164/1/2016APASS
DetailsDaryl DeGrange
Site lighting underground north and west of main bldg. Phone #: ###-#### Inspection requested via web by Debby Pierce rough-in ok cover underground,Prefab pole bases not on site.
Electrical Rough-In3/24/20163/25/20163/25/2016APASS
DetailsBob Reichert
Underground comm. west of main building with vault. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g ok as requested
Electrical Rough-In3/23/20163/24/20163/24/2016APASS
DetailsBob Reichert
Underground comm conduits between main building and storage building/vault. Phone #: ###-#### Inspection requested via web by Debby Pierce ok cover u/g as requested, runs e-w north of storage building
Electrical Rough-In3/21/20163/22/20163/22/2016APASS
DetailsBob Reichert
Underground from main gear north under footing. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g ok as requested
Electrical Rough-In3/18/20163/21/20163/21/2016APASS
DetailsBob Reichert
underground cover. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g center area for meters, fire pump, east side running n-s by building