Final | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | PASS |
James Ady
|
|
|
Final final, all that is remaining is the fuel island and automatic gate. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
|
Final | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PART |
James Ady
|
|
|
Paint booth final. Phone #: ###-#### Inspection requested via web by Debby Pierce Check equipment hook ups at time of fuel island final. Spray booth final only ok
|
Electrical Rough-In | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | PASS |
James Ady
|
|
|
Fuel island underground cover. Phone #: ###-#### Inspection requested via web by Debby Pierce underground only ok to cover
|
Conference | 12/22/2016 | 12/27/2016 | 12/27/2016 | A | DONE |
James Ady
|
|
|
Conference request for fuel island. Phone #: ###-#### Inspection requested via web by Debby Pierce Talked about seal off location inside pole light. Needs to be at hand hole in pole
|
Final | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
James Ady
|
|
|
Remainder of building drive thru wash bay. Phone #: ###-#### Inspection requested via web by Debby Pierce Drive thru wash final ok
|
Final | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | PART |
James Ady
|
|
|
Remainder of building and exterior with the exception of the drive thru wash bay. Phone #: ###-#### Inspection requested via web by Debby Pierce No washbay, Need GFCI on E Drop cord of Grounds shop,Partial Final ok
|
Final | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PART |
James Ady
|
|
|
Partial final, north office area, warehouse and site/exterior of building. Phone #: ###-#### Inspection requested via web by Debby Pierce Partial final North office and Wearhouse only Final ok
|
Final | 11/29/2016 | 11/29/2016 | 11/29/2016 | A | NR |
James Ady
|
|
|
Ceiling cover, all remaining grid south of administration area. Phone #: ###-#### Inspection requested via web by Debby Pierce Needed rough in Not final
|
Electrical Rough-In | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
James Ady
|
|
|
Ceiling cover, all remaining grid south of administration area. Phone #: ###-#### Inspection requested via web by Debby Pierce Ceiling only ok to cover
|
Electrical Rough-In | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PASS |
James Ady
|
|
|
Ceiling cover for administration office area north of grid line P. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
|
Permanent Service | 11/2/2016 | 11/3/2016 | 11/3/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce p/s u/g n ok
|
Electrical Rough-In | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
James Ady
|
|
|
Underground cover for PVC from building stub outs to future fuel island. Phone #: ###-#### Inspection requested via web by Debby Pierce underground ok to cover
|
Electrical Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
James Ady
|
|
|
Wall rough in a at grid line 3.1 in grounds warehouse. Phone #: ###-#### Inspection requested via web by Debby Pierce Rough in ok to cover
|
Electrical Rough-In | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
James Ady
|
|
|
Partial rough in on wall 3.1 between grid lines H and M. Phone #: ###-#### Inspection requested via web by Debby Pierce ok to cover
|
Electrical Rough-In | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Daryl DeGrange
|
|
|
Wall rough in under main mezzanine, book storage and restroom/showers. Phone #: ###-#### Inspection requested via web by Debby Pierce rough-in ok cover
|
Electrical Rough-In | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PASS |
Bob Reichert
|
|
|
Partial interior office wall cover inspection, also quick conference on classified location area. Phone #: ###-#### Inspection requested via web by Debby Pierce inner office area and perimeter walls ok cover, will do conference later
|
Electrical Rough-In | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Bob Reichert
|
|
|
Partial wall rough in for north side of building administration area, south to grid line P. Phone #: ###-#### Inspection requested via web by Debby Pierce walls only, per contractor description for inspection request ok cover
|
Electrical Rough-In | 5/7/2016 | 5/9/2016 | 5/9/2016 | A | PASS |
Eric Story
|
|
|
Two floor boxes in north section of main building slab. Phone #: ###-#### Inspection requested via web by Debby Pierce 2 floor boxes and underground in the north end of structure ok cover
|
Electrical Rough-In | 4/18/2016 | 4/19/2016 | 4/19/2016 | A | PASS |
Bob Reichert
|
|
|
Under slab conduit cover. Phone #: ###-#### Inspection requested via web by Debby Pierce ok pour slab west part main building
|
Electrical Rough-In | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | PASS |
Bob Reichert
|
|
|
Underground main bldg. Phone #: ###-#### Inspection requested via web by Debby Pierce ok cover u/g going n-s middle main building
|
Electrical Rough-In | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Bob Reichert
|
|
|
Ufer ground for fire pump main switch in main building, concrete pours in at 10AM. Phone #: ###-#### Inspection requested via web by Debby Pierce ok pour concrete encased electrode
|
Electrical Rough-In | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PASS |
Daryl DeGrange
|
|
|
Site lighting underground north and west of main bldg. Phone #: ###-#### Inspection requested via web by Debby Pierce rough-in ok cover underground,Prefab pole bases not on site.
|
Electrical Rough-In | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Bob Reichert
|
|
|
Underground comm. west of main building with vault. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g ok as requested
|
Electrical Rough-In | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | PASS |
Bob Reichert
|
|
|
Underground comm conduits between main building and storage building/vault. Phone #: ###-#### Inspection requested via web by Debby Pierce ok cover u/g as requested, runs e-w north of storage building
|
Electrical Rough-In | 3/21/2016 | 3/22/2016 | 3/22/2016 | A | PASS |
Bob Reichert
|
|
|
Underground from main gear north under footing. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g ok as requested
|
Electrical Rough-In | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Bob Reichert
|
|
|
underground cover. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g center area for meters, fire pump, east side running n-s by building
|