Final | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher correct breaker installed final ok
|
Final | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | CANC |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher needed r/i for now
|
Electrical Rough-In | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher new 20 amp circuit to D/W and Disp. and fix exposed SER cable subject to damage in crawl. Chris will install 80 amp breaker on #2 alum ser
|